BLD97-00401
| INSP - Final | 7/29/1997 | 7/29/1997 | 7/29/1997 12:00:00 AM | | FAIL |
|
|
/ / 406 - FINAL INSP OF DELUGE SYSTEM FOR SILANE STATION FAIL SOL VLV
|
BLD96-00987
| INSP-Sprinkler Rough-in/Hydro | 7/28/1997 | 7/29/1997 | 7/29/1997 12:00:00 AM | A | PART |
|
|
07/29/97 406 - FINAL ON BLDG "C" OK FOR TEMP OCC SCHED BATT ALARM TEST DETECTORS CHECK 2 EXIT LIGHTS CLEAN SPKLR HEADS
|
BLD96-01379
| INSP-Conference | 7/29/1997 | 7/29/1997 | 7/29/1997 12:00:00 AM | P | PASS |
|
|
/ / 406 - CONF ON ALARM SYSTEM REQUIRE LETTER TO DEACTIVATE DOOR HOLD DECISION MADE
|
BLD97-00401
| INSP - Final | 7/29/1997 | 7/29/1997 | 7/29/1997 12:00:00 AM | P | PART |
|
|
/ / 406 - ALARM TEST ON GAS DETECTION SYSTEM PASS
|