PLM02-01838
| Final | 7/26/2002 | 7/29/2002 | 7/29/2002 12:00:00 AM | A | FAIL |
|
|
fn -steve- ###-#### pipe t&p and pan drain to floor caulk fixture,s to wall need to provide thermal expansion tank for water heater need to have premise protection tested and certified 7/29/2002 1:43:25 PM
|
PLM02-01827
| Final | 7/26/2002 | 7/29/2002 | 7/29/2002 12:00:00 AM | A | PASS |
|
|
###-#### CHRIS
|
PLM02-02293
| Final | 7/26/2002 | 7/29/2002 | 7/29/2002 12:00:00 AM | A | CANC |
|
|
jan- ###-#### canc. by jan 7/29/2002 9:48:04 AM
|
PLM02-01669
| Final | 7/26/2002 | 7/29/2002 | 7/29/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/26/2002 at 11:25:33. Contact: ###-####. need to have sprinkler backflow permited tested and certified oked temp. told general contractor . 7/29/2002 2:32:02 PM
|
PLM02-00926
| Plumbing Rough-in | 7/26/2002 | 7/29/2002 | 7/29/2002 12:00:00 AM | A | PART |
|
|
pete ###-#### need to nail plate add some more pipe strap,s to water system drain,s and water test ok 7/29/2002 1:01:07 PM
|
PLM02-02288
| Water and/or Sewer | 7/26/2002 | 7/29/2002 | 7/29/2002 12:00:00 AM | P | PART |
|
|
drew ###-#### water line only water line from meter location to five foot out side building test ok ok to cover 7/29/2002 4:35:35 PM
|
PLM02-02122
| Final | 7/29/2002 | 7/29/2002 | 7/29/2002 12:00:00 AM | P | PASS |
|
|
###-#### harriet
|
PLM02-02234
| Plumbing Rough-in | 7/29/2002 | 7/29/2002 | 7/29/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/29/2002 at 10:27:46. Contact: ###-####.
|
PLM02-02297
| Water and/or Sewer | 7/29/2002 | 7/29/2002 | 7/29/2002 12:00:00 AM | P | PART |
|
|
SHARON; Phone #: ###-#### piping from future water meter location to under under existing duplex test ok contractor to call when ready for well disconnect 7/29/2002 3:38:04 PM
|