Inspections for the day of: Tuesday, July 29, 2003.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM03-02302 Water and/or Sewer7/28/20037/29/20037/29/2003 12:00:00 AMAPART
###-#### bob
PLM03-00673 Final7/28/20037/29/20037/29/2003 12:00:00 AMAPASS
final ok thank you ken 7/29/2003 11:42:47 AM
PLM03-00435 Final7/28/20037/29/20037/29/2003 12:00:00 AMANH
jake; Phone #: ###-#### Internet Inspection Request from: Barbara Moore wants a partial final for the south portion of the duplex, told them they'd have to get approval from jg. 7/29/2003 11:59:16 AM
PLM03-02308 Water and/or Sewer7/28/20037/29/20037/29/2003 12:00:00 AMAPASS
###-#### jim 2 water lines and 1 sewer line ok to cover with clean fill on the job. 7/29/2003 8:51:21 AM
PLM03-02318 Groundwork7/29/20037/29/20037/29/2003 12:00:00 AMAPART
part gw from a 4" co about 2/3rds of the way thru the building downstream to exit deep main and branches 7/29/2003 10:46:08 AM
PLM03-01354 Final7/29/20037/29/20037/29/2003 12:00:00 AMAFAIL
needs sprinkler exposed and permitted
PLM03-01772 Final7/29/20037/29/20037/29/2003 12:00:00 AMAPASS
final ook 7/29/2003 9:47:48 AM
PLM03-02318 Groundwork7/29/20037/29/20037/29/2003 12:00:00 AMPPART
###-#### Liz another 60' upstream 7/29/2003 2:49:01 PM
PLM02-03029 Final7/28/20037/29/20037/29/2003 12:00:00 AMPPASS
###-#### steve final ok 7/29/2003 2:14:21 PM
PLM03-02322 Plumbing Rough-in7/29/20037/29/20037/29/2003 12:00:00 AMPPASS
###-#### craig ri ok 7/29/2003 3:32:54 PM
PLM03-01354 Final7/29/20037/29/20037/29/2003 12:00:00 AMPNR
Phone #: ###-#### Internet Inspection Request from: Liz Sasser floors just got sealed cant go in 7/29/2003 3:13:50 PM
PLM03-02331 Sprinkler (Final)7/29/20037/29/20037/29/2003 12:00:00 AMPPART
tie in ok
PLM03-02338 Water and/or Sewer7/29/20037/29/20037/29/2003 12:00:00 AMPPASS
sw final ok
PLM03-02244 Plumbing Rough-in7/29/20037/29/20037/29/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 7/29/2003 at 8:41:16 AM. Contact: ###-####. ri ok 7/29/2003 2:03:42 PM
PLM03-02311 Water and/or Sewer7/29/20037/29/20037/29/2003 12:00:00 AMPPASS
###-#### rob sw final ok 7/29/2003 11:56:22 AM 7/29/2003 11:56:43 AM
PLM03-02313 Sprinkler (Final)7/29/20037/29/20037/29/2003 12:00:00 AMPPASS
###-#### john sp final ok 7/29/2003 11:00:28 AM
PLM03-02302 Water and/or Sewer7/29/20037/29/20037/29/2003 12:00:00 AMPPART
water line only at this time they're looking at a sewer stub from the north will let us know if it works out 7/29/2003 11:02:07 AM