BLD08-01477
| BLD-Footing | 7/29/2008 | 7/29/2008 | 7/30/2008 10:11:29 AM | P | PART |
|
|
pete - ###-#### early wip
|
BLD08-01270
| BLD-Concrete | 7/28/2008 | 7/29/2008 | 7/30/2008 9:46:49 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 7/28/2008 at 4:34:44 PM. Contact: ###-####. partial ftg,, met w/ owner, struct engineer, sub contractor
|
BLD08-01477
| BLD-Footing | 7/28/2008 | 7/29/2008 | 7/29/2008 3:01:35 PM | P | PART |
|
|
pete - ###-#### Note: late afternoon wip,, no verts yet
|
BLD08-01593
| BLD-Framing/Rough-in | 7/28/2008 | 7/29/2008 | 7/29/2008 2:39:46 PM | A | NR |
|
|
doug Phone #: ###-#### on site conf only,, need trades,, was a swo,,
|
BLD08-01247
| BLD-Energy code compliance | 7/29/2008 | 7/29/2008 | 7/29/2008 2:36:59 PM | P | PART |
|
|
Ryan- call 15 min prior Phone #: ###-#### wip on insulation.. conf on headroom fixes,, will reschedule
|
BLD08-01044
| BLD-Framing/Rough-in | 7/28/2008 | 7/29/2008 | 7/29/2008 11:58:43 AM | A | PART |
|
|
breeann - look for 2602 Phone #: ###-#### need mech. r/in,, ok to insulate
|
BLD08-00956
| BLD-Other | 7/28/2008 | 7/29/2008 | 7/29/2008 11:17:44 AM | A | PASS |
|
|
Rod Note: ceiling cover Phone #: ###-#### 1st floor and basement I. T rooms ok on ceiling grid
|
BLD08-00927
| BLD-Final | 7/28/2008 | 7/29/2008 | 7/29/2008 11:01:17 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/28/2008 at 11:05:02 AM. Contact: ###-####.
|
BLD08-00927
| DOC - Permit Finaled | 7/29/2008 | 7/29/2008 | 7/29/2008 11:01:01 AM | P | PASS |
|
|
all ok
|
BLD08-00902
| BLD-Wall cover | 7/28/2008 | 7/29/2008 | 7/29/2008 10:46:43 AM | A | PART |
|
|
Please call Dan Appel before inspection to insure approved plans onsite. Phone #: ###-#### Internet Inspection Request from: Daniel Appel ext ok to cover
|