PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, July 29, 2008
.
Number of inspections:
32
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC08-00184
Random Inspection
7/29/2008
7/29/2008
7/29/2008 4:55:52 PM
P
PASS
Site looks good.
ESC06-00142
Aging Inspection
7/29/2008
7/29/2008
7/29/2008 4:50:29 PM
PASS
ESC06-00142
Site Final
7/29/2008
7/29/2008
7/29/2008 4:50:19 PM
P
PASS
All work is complete.
CAS
ESC08-00074
General Inspection
7/29/2008
7/29/2008
7/29/2008 4:49:14 PM
P
PART
site looks good. Told RP to install a Washout sigh for project.
CAS
ESC08-00486
General Inspection
7/29/2008
7/29/2008
7/29/2008 3:49:41 PM
P
PASS
Site looks good. No issues present.
CAS
ESC08-00349
General Inspection
7/29/2008
7/29/2008
7/29/2008 3:35:12 PM
P
PASS
ESC06-00123
Aging Inspection
7/29/2008
7/29/2008
7/29/2008 3:24:10 PM
PASS
ESC06-00123
Site Final
7/29/2008
7/29/2008
7/29/2008 3:24:00 PM
P
PASS
All work is complete.
CAS
ESC06-00146
Aging Inspection
7/29/2008
7/29/2008
7/29/2008 3:23:00 PM
PASS
ESC06-00146
Site Final
7/29/2008
7/29/2008
7/29/2008 3:22:44 PM
P
PASS
All work is complete.
CAS
ESC06-00148
Aging Inspection
7/29/2008
7/29/2008
7/29/2008 3:21:56 PM
PASS
ESC06-00148
Site Final
7/29/2008
7/29/2008
7/29/2008 3:21:43 PM
P
PASS
All work is complete.
CAS
ESC06-00971
Site Final
7/29/2008
7/29/2008
7/29/2008 2:49:32 PM
P
PASS
ESC07-00133
Site Final
7/29/2008
7/29/2008
7/29/2008 2:49:10 PM
P
PASS
ESC07-00887
Site Final
7/29/2008
7/29/2008
7/29/2008 2:48:55 PM
P
PASS
ESC07-00771
Site Final
7/29/2008
7/29/2008
7/29/2008 2:48:39 PM
P
PASS
ESC08-00625
Site Preparation
7/25/2008
7/29/2008
7/29/2008 2:42:03 PM
A
DEFR
Moved to a general.
ESC08-00625
General Inspection
7/29/2008
7/29/2008
7/29/2008 2:41:57 PM
P
PASS
Site looks good.
CAS
ESC07-01269
Complaint Inspection
7/29/2008
7/29/2008
7/29/2008 2:24:23 PM
P
DONE
Cleaned up rock off of road that came off of the entrance of the driveway.
CAS
460
ESC08-00572
Site Preparation
7/29/2008
7/29/2008
7/29/2008 1:51:22 PM
P
PASS
ESC08-00115
General Inspection
7/28/2008
7/29/2008
7/29/2008 1:42:02 PM
P
FAIL
Verbal Notice to RP
Clean ALL hard surfaces. Maintain D.I.'s.
Will re-inpect on 7/30/08
CAS
ESC08-00173
Tracking Control
7/24/2008
7/29/2008
7/29/2008 11:35:27 AM
A
PART
Will re-installing the entrance later this week. Keeping entrance swept up on a daily basis.
CAS
ESC07-01595
Conference
7/29/2008
7/29/2008
7/29/2008 11:32:18 AM
A
DONE
Went over plans and inspected the exterior of the project area. Need to protect one D.I. and maintain the other two. Need to add secondary protection on the D.I. at the East end of project by the washout out.
CAS
ESC08-00033
General Inspection
7/25/2008
7/29/2008
7/29/2008 9:13:22 AM
A
PART
Need to maintain bmp's along front and clean up the drive way. Site is clean.
CAS
ESC08-00608
Site Preparation
7/25/2008
7/29/2008
7/29/2008 8:53:24 AM
A
DEFR
Moved to a General inspection
CAS
ESC08-00608
General Inspection
7/29/2008
7/29/2008
7/29/2008 8:52:57 AM
P
FAIL
Need to protect D.I. at the back of building.
CAS
ESC08-00628
General Inspection
7/29/2008
7/29/2008
7/29/2008 8:37:58 AM
A
DEFR
Moved to a site final.
CAS
ESC08-00628
Site Final
7/29/2008
7/29/2008
7/29/2008 8:37:38 AM
A
PASS
All work is complete. All disturbed soil is stabilized and BMP's are removed.
CAS
ESC08-00628
Site Preparation
7/25/2008
7/29/2008
7/29/2008 8:26:10 AM
A
DEFR
Moved to a "General" inspection.
CAS
ESC08-00442
Site Preparation
7/22/2008
7/29/2008
7/29/2008 8:24:26 AM
A
PASS
Site looks good. Trey will have the parking lot drain protected by the end of the day.
CAS
ESC08-00550
Site Preparation
7/25/2008
7/29/2008
7/29/2008 8:14:40 AM
A
NR
Will re-inspect on 8/5/08.
CAS
ESC07-01595
Tracking Control
7/24/2008
7/29/2008
7/28/2008 10:25:20 AM
A
PASS
Entrance installed.
CAS