Inspections for the day of: Thursday, July 29, 2010.
Number of inspections: 11
Percentage of inspections complete: 82 %
Percentage of inspections not complete: 18 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS10-00202 BLD-Conference7/15/20107/23/2010 A 
check back....
BLD10-01457 BLD-Conference7/22/20107/23/2010 A 
TERRY HAGEN Phone #: ###-#### >> Inspection requested via web by Sandra Judge
BLD10-01457 BLD-Conference7/29/20107/29/20107/29/2010 5:39:56 PMPCANC
Check back... Re-sched....
BLD10-01206 BLD-Framing/Rough-in7/29/20107/29/20107/29/2010 5:39:32 PMPPART
John Phone #: ###-####
C/N....Holes in soffits....lat truss bracing.....Attic ventilation......wood fiber trim at exterior.
BLD04-01642 BLD-Conference7/28/20107/29/20107/29/2010 5:37:18 PMPDONE
Dana Phone #: ###-####
Handrails and garage separation.
MIS10-00223 BLD-Final7/28/20107/29/20107/29/2010 5:36:38 PMAFAIL
Jason PLEASE CALL 30 MIN BEFORE GOING OUT Phone #: ###-####
Unable to sign off........foundation will not comply with requirements.
MIS10-00223 DOC - Permit Finaled7/29/20107/29/20107/29/2010 5:35:03 PMPPASS
ESC10-00412 Site Preparation7/29/20107/29/20107/29/2010 3:34:47 PMPFAIL
Post sign....Do not pour without concrete washout area.
BLD10-01444 BLD-Final7/28/20107/29/20107/29/2010 3:31:35 PMAPASS
Junior Phone #: ###-####
OK for Perm Occ.
BLD10-01708 BLD-Footing7/28/20107/29/20107/29/2010 12:55:05 PMAPASS
Jim Ashby-Early morning if possible as poaur is scheduled for 11:00 Phone #: ###-####
BLD10-01106 BLD-Footing7/28/20107/29/20107/29/2010 12:37:37 PMAPASS
Musto Phone #: ###-####