FIR09-00535
| INSP-Final Inspection | 7/29/2010 | 7/29/2010 | 7/30/2010 2:48:57 PM | P | PASS |
|
|
Permit finaled
|
FIR10-00238
| INSP-Sprinkler Rough-in | 7/29/2010 | 7/29/2010 | 7/29/2010 2:57:30 PM | P | CANC |
|
|
Cancelled due to time constraints caused by Micron plan review. Will be rescheduled for tomorrow per the fitter.
|
FIR10-00262
| INSP-Sprinkler Rough-in | 7/29/2010 | 7/29/2010 | 7/29/2010 2:55:43 PM | P | PART |
|
|
The offices 100, 102, 103 and 104 are actually being used for storage of paintings. These areas will need to be addressed as Ordinary Hazard. Also per the fitter the ceilings in these same areas are not going to be installed. Resubmittals will be required. That being said the sprinkler piping can be covered. All of the overhead sprinkler piping was inspected today and passed except a lift will not be available until next week to verify heads, distances from the deck and hangers. There are still hanger issues being addressed by the plan reviewer and Treasure Valley Fire. So hangers and sway bracing has not been inspected yet. Insulation neeeds to be installed at the deck as discussed above the upper mezzanine offices and the insulation that is hanging down in the warehouse needs to be repaired.
|
BLD10-01591
| FIRE-Final Inspection | 7/26/2010 | 7/29/2010 | 7/29/2010 10:17:49 AM | P | PASS |
|
|
Life safety passed.
|
FIR10-00353
| INSP-Sprinkler Rough-in | 7/28/2010 | 7/29/2010 | 7/29/2010 10:17:17 AM | A | PASS |
|
|
Previous correction notice items have been addressed. All sprinkler piping is ok to cover.
|
FIR05-00590
| INSP-Final Inspection | 7/28/2010 | 7/29/2010 | 7/29/2010 10:16:25 AM | A | PASS |
|
|
Permit finaled
|
BLD10-01444
| FIRE-Final Inspection | 7/28/2010 | 7/29/2010 | 7/28/2010 3:18:34 PM | A | PASS |
|
|
Life safety passed.
|