Inspections for the day of: Friday, July 29, 2011.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00787 Site Preparation7/29/20117/29/20117/29/2011 4:02:46 PM NR
ESC11-00176 Tracking Control7/28/20117/29/20117/29/2011 4:02:16 PMPCANC
Moved until 8/2/2011. Will be swept at the end of the evening on 7/29/2011.
ESC11-00454 Site Preparation7/29/20117/29/20117/29/2011 2:25:31 PM PASS
ESC11-00355 BMP Violation7/28/20117/29/20117/29/2011 1:36:22 PMPFAIL
CORRECTION NOTICE:
Maintain the storm drain inlets at the west end of the project in both courts. Will re-inspect on 8/3/2011AM.
ESC11-00355 BMP Violation7/29/20117/29/20117/29/2011 1:31:44 PMPCANC
Wtrong date.
ESC11-00117 General Inspection7/29/20117/29/20117/29/2011 1:20:46 PM PASS
ESC11-00519 Site Preparation7/29/20117/29/20117/29/2011 1:20:36 PM FAIL
Verbal to Contractor: RP is out until 15th.

Install a stabilized construction exit per the approved methods. Clean up all tracking out of the staging area. Will follow up on 8/2/2011AM.
ESC11-00184 General Inspection7/29/20117/29/20117/29/2011 7:57:39 AM PART
Will have a conference with the RP over other mminor issues.
ESC10-00600 General Inspection7/29/20117/29/20117/29/2011 7:56:45 AM PART
Waiting of the vegitation to establish.
ESC10-00495 General Inspection7/29/20117/29/20117/29/2011 7:56:16 AM PART
Need to acheive vegitation on the slopes of the lot transitions.
ESC10-00786 BMP Violation7/28/20117/29/20117/29/2011 7:54:32 AMPPART
A mulch and tachifier will be applied on 8/2/2011. Will check up on 8/3/2011