ESC10-00787
| Site Preparation | 7/29/2011 | 7/29/2011 | 7/29/2011 4:02:46 PM | | NR |
|
|
|
ESC11-00176
| Tracking Control | 7/28/2011 | 7/29/2011 | 7/29/2011 4:02:16 PM | P | CANC |
|
|
Moved until 8/2/2011. Will be swept at the end of the evening on 7/29/2011.
|
ESC11-00454
| Site Preparation | 7/29/2011 | 7/29/2011 | 7/29/2011 2:25:31 PM | | PASS |
|
|
|
ESC11-00355
| BMP Violation | 7/28/2011 | 7/29/2011 | 7/29/2011 1:36:22 PM | P | FAIL |
|
|
CORRECTION NOTICE: Maintain the storm drain inlets at the west end of the project in both courts. Will re-inspect on 8/3/2011AM.
|
ESC11-00355
| BMP Violation | 7/29/2011 | 7/29/2011 | 7/29/2011 1:31:44 PM | P | CANC |
|
|
Wtrong date.
|
ESC11-00117
| General Inspection | 7/29/2011 | 7/29/2011 | 7/29/2011 1:20:46 PM | | PASS |
|
|
|
ESC11-00519
| Site Preparation | 7/29/2011 | 7/29/2011 | 7/29/2011 1:20:36 PM | | FAIL |
|
|
Verbal to Contractor: RP is out until 15th.
Install a stabilized construction exit per the approved methods. Clean up all tracking out of the staging area. Will follow up on 8/2/2011AM.
|
ESC11-00184
| General Inspection | 7/29/2011 | 7/29/2011 | 7/29/2011 7:57:39 AM | | PART |
|
|
Will have a conference with the RP over other mminor issues.
|
ESC10-00600
| General Inspection | 7/29/2011 | 7/29/2011 | 7/29/2011 7:56:45 AM | | PART |
|
|
Waiting of the vegitation to establish.
|
ESC10-00495
| General Inspection | 7/29/2011 | 7/29/2011 | 7/29/2011 7:56:16 AM | | PART |
|
|
Need to acheive vegitation on the slopes of the lot transitions.
|
ESC10-00786
| BMP Violation | 7/28/2011 | 7/29/2011 | 7/29/2011 7:54:32 AM | P | PART |
|
|
A mulch and tachifier will be applied on 8/2/2011. Will check up on 8/3/2011
|