FIR13-00336
| INSP-Final Inspection | 7/26/2013 | 7/29/2013 | 7/29/2013 3:46:49 PM | P | PASS |
|
|
Permit finaled
|
FIR13-00184
| INSP-Sprinkler Rough-in/Hydro | 7/26/2013 | 7/29/2013 | 7/29/2013 3:44:20 PM | P | PASS |
|
|
See the city approved plans for the first floor areas where the sprinkler piping is ok to cover. Plan modifications may be needed showing the different sprinkler pendants installed and pipe routing changes. Contractor needs to have a conversation with the sprinkler plan reviewer to get a resolution.
|
FIR13-00095
| INSP-Supply line flush | 7/29/2013 | 7/29/2013 | 7/29/2013 3:41:17 PM | P | PASS |
|
|
Underground flush passed
|
FIR13-00286
| INSP-Sprinkler Rough-in | 7/29/2013 | 7/29/2013 | 7/29/2013 2:54:53 PM | P | PASS |
|
|
Piping in corridor near Anderson Const. office is ok to cover. See marked plans.
|
FIR13-00115
| INSP-Sprinkler Rough-in | 7/29/2013 | 7/29/2013 | 7/29/2013 2:51:40 PM | P | PASS |
|
|
See the city approved plans for additional ceiling areas that are ok to install and cover sprinkler piping.
|
FIR13-00163
| INSP-Sprinkler Rough-in | 7/29/2013 | 7/29/2013 | 7/29/2013 2:29:53 PM | P | PASS |
|
|
The piping in the room immediately across from the construction office is ok to cover.
|
BLD13-01894
| FIRE-Final Inspection | 7/26/2013 | 7/29/2013 | 7/29/2013 11:47:37 AM | A | FAIL |
|
|
Remove the thumbturn lock, provide lever hardware and the sticker as discussed for the main exit. Provide fire extinguisher as well.
|
BLD13-01432
| FIRE-Final Inspection | 7/29/2013 | 7/29/2013 | 7/29/2013 10:12:35 AM | P | PASS |
|
|
Life safety passed
|
FIR13-00281
| INSP-Final Inspection | 7/29/2013 | 7/29/2013 | 7/29/2013 9:37:53 AM | P | PASS |
|
|
Permit finaled
|
BLD13-01047
| FIRE-Final Inspection | 7/26/2013 | 7/29/2013 | 7/29/2013 9:17:15 AM | A | PASS |
|
|
life safety passed
|
FIR12-00605
| INSP-Sprinkler Rough-in/Hydro | 7/26/2013 | 7/29/2013 | 7/29/2013 9:11:13 AM | A | PASS |
|
|
The flush of both underground supply lines passed.
|