Inspections for the day of: Monday, July 29, 2013.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00336 INSP-Final Inspection7/26/20137/29/20137/29/2013 3:46:49 PMPPASS
Permit finaled
FIR13-00184 INSP-Sprinkler Rough-in/Hydro7/26/20137/29/20137/29/2013 3:44:20 PMPPASS
See the city approved plans for the first floor areas where the sprinkler piping is ok to cover. Plan modifications may be needed showing the different sprinkler pendants installed and pipe routing changes. Contractor needs to have a conversation with the sprinkler plan reviewer to get a resolution.
FIR13-00095 INSP-Supply line flush7/29/20137/29/20137/29/2013 3:41:17 PMPPASS
Underground flush passed
FIR13-00286 INSP-Sprinkler Rough-in7/29/20137/29/20137/29/2013 2:54:53 PMPPASS
Piping in corridor near Anderson Const. office is ok to cover. See marked plans.
FIR13-00115 INSP-Sprinkler Rough-in7/29/20137/29/20137/29/2013 2:51:40 PMPPASS
See the city approved plans for additional ceiling areas that are ok to install and cover sprinkler piping.
FIR13-00163 INSP-Sprinkler Rough-in7/29/20137/29/20137/29/2013 2:29:53 PMPPASS
The piping in the room immediately across from the construction office is ok to cover.
BLD13-01894 FIRE-Final Inspection7/26/20137/29/20137/29/2013 11:47:37 AMAFAIL
Remove the thumbturn lock, provide lever hardware and the sticker as discussed for the main exit. Provide fire extinguisher as well.
BLD13-01432 FIRE-Final Inspection7/29/20137/29/20137/29/2013 10:12:35 AMPPASS
Life safety passed
FIR13-00281 INSP-Final Inspection7/29/20137/29/20137/29/2013 9:37:53 AMPPASS
Permit finaled
BLD13-01047 FIRE-Final Inspection7/26/20137/29/20137/29/2013 9:17:15 AMAPASS
life safety passed
FIR12-00605 INSP-Sprinkler Rough-in/Hydro7/26/20137/29/20137/29/2013 9:11:13 AMAPASS
The flush of both underground supply lines passed.