MEC15-03372
| Rough-in | 7/28/2015 | 7/29/2015 | 7/29/2015 6:29:04 PM | A | NR |
|
|
Kyle Phone #: ###-#### will inspect in the am acca report ready to resubmit
|
MEC15-03558
| Rough-in | 7/28/2015 | 7/29/2015 | 7/29/2015 6:28:25 PM | A | NR |
|
|
Inspector was out there Pasted pressure test on gas line inspector was Bill need us to pull separate permit we are just setting furnace, homeowner did all the duct called it in on his permit. Phone #: ###-#### Inspection requested via web by Lori Dille will inspect in the am ready to submit the acca report
|
PLM15-00989
| Roof Drains | 7/28/2015 | 7/29/2015 | 7/29/2015 6:25:12 PM | P | PART |
|
|
Thank you Phone #: ###-#### Inspection requested via web by Sabrina Amidon piping looks ok will check the test in the morning, design needs to be resubmitted.
|
MEC15-03576
| Final | 7/29/2015 | 7/29/2015 | 7/29/2015 6:23:42 PM | P | PASS |
|
|
Please be mid afternoon with a call to Maddie on way ###-####. Thanks Phone #: ###-#### Inspection requested via web by Allie Courter
|
MEC15-03520
| Final | 7/27/2015 | 7/29/2015 | 7/29/2015 3:14:23 PM | P | PASS |
|
|
Installer Brandan ###-#### Phone #: ###-#### Inspection requested via web by Dustin Rich
|
MEC15-03542
| Final | 7/28/2015 | 7/29/2015 | 7/29/2015 3:08:25 PM | P | PASS |
|
|
Please call Chad to arrange time and access for this inspection Phone #: ###-#### Inspection requested via web by Diane Day
|
PLM15-02535
| Plumbing Rough-in | 7/28/2015 | 7/29/2015 | 7/29/2015 2:43:50 PM | P | PASS |
|
|
Raul''s own house Phone #: ###-#### Inspection requested via web by Raul Castanon ri ok with shielded coupling at sewer connection in crawl
|
PLM15-02541
| Sprinkler (Final) | 7/29/2015 | 7/29/2015 | 7/29/2015 2:30:23 PM | P | PASS |
|
|
rescheduled to pm for backflow cert.
|
PLM15-02530
| Final | 7/28/2015 | 7/29/2015 | 7/29/2015 2:16:43 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ben Davis
|
PLM15-02523
| Water and/or Sewer | 7/29/2015 | 7/29/2015 | 7/29/2015 10:46:01 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Daniel Isbell shower ri final ok
|
PLM15-02523
| Final | 7/29/2015 | 7/29/2015 | 7/29/2015 10:45:38 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Daniel Isbell
|
PLM15-02523
| Final | 7/29/2015 | 7/29/2015 | 7/29/2015 10:44:55 AM | P | PASS |
|
|
please call customer when on way Catherine ###-#### Phone #: ###-#### Inspection requested via web by Dustin Rich
|
MEC15-03554
| Final | 7/28/2015 | 7/29/2015 | 7/29/2015 10:34:56 AM | A | PASS |
|
|
please call customer when on way Catherine ###-#### Phone #: ###-#### Inspection requested via web by Dustin Rich
|
MEC15-03344
| Final | 7/22/2015 | 7/29/2015 | 7/29/2015 10:21:29 AM | A | PASS |
|
|
This is a Flue Pressure and Final Inspect. Please meet our installer at home at 10 AM. Contact for Right Now is Mary ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
MEC15-02978
| Pressure Test | 7/28/2015 | 7/29/2015 | 7/29/2015 9:36:49 AM | A | CANC |
|
|
Paul will be there in the morning p;ease call when heading his way to confirm time. Thanks! Phone #: ###-#### Inspection requested via web by Brenda St Clair no pressure test
|
MEC15-02978
| Final | 7/28/2015 | 7/29/2015 | 7/29/2015 9:31:59 AM | A | PASS |
|
|
Paul will be there in the morning p;ease call when heading his way to confirm time. Thanks! Phone #: ###-#### Inspection requested via web by Brenda St Clair
|
MEC15-03386
| Rough-in | 7/27/2015 | 7/29/2015 | 7/29/2015 8:58:48 AM | A | FAIL |
|
|
Call Daniel ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss needs acca report
|
MEC15-03386
| Pressure Test | 7/27/2015 | 7/29/2015 | 7/29/2015 8:58:04 AM | A | PASS |
|
|
Call Daniel ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss needs acca report 20# test ok 5# flue ok
|
MEC15-02348
| Rough-in | 7/28/2015 | 7/29/2015 | 7/29/2015 8:27:14 AM | A | PASS |
|
|
Please call Joe, Thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum duct seal in training room ok
|