Inspections for the day of: Wednesday, July 29, 2015.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00195 INSP-Final Inspection7/28/20157/29/20157/30/2015 2:14:13 PMPPASS
As-builts have not bee provided yet.
*10/20/15 - As builts accepted by plan reviewer*
FIR14-00799 INSP-Final Inspection7/29/20157/29/20157/29/2015 3:06:27 PMPPASS
Permit finaled
FIR15-00504 INSP-Sprinkler Rough-in7/29/20157/29/20157/29/2015 2:19:24 PMPPASS
Rough-in passed. Earth quake bracing has not been installed yet but will be verified at next rough-in when I verify the combustible concealed space has been filled with insulation. Sheet rock can not be installed yet.
BLD15-00195 FIRE-Final Inspection7/28/20157/29/20157/29/2015 1:53:18 PMPPASS
Life safety passed
FIR15-00455 INSP-Final Inspection7/29/20157/29/20157/29/2015 1:26:07 PMPPASS
permit finaled
BLD15-01744 FIRE-Final Inspection7/29/20157/29/20157/29/2015 12:54:55 PMPPASS
life safety passed
BLD15-00803 FIRE-Final Inspection7/28/20157/29/20157/29/2015 11:22:30 AMAPASS
Life safety passed
FIR15-00437 INSP-Final Inspection7/29/20157/29/20157/29/2015 10:56:56 AMPPASS
Permit finaled
FIR15-00215 INSP-Supply line flush7/28/20157/29/20157/29/2015 10:18:02 AMAPASS
Underground flush passed
FIR15-00216 INSP-Supply line flush7/28/20157/29/20157/29/2015 10:17:03 AMAPASS
Underground flush passed
FIR15-00217 INSP-Supply line flush7/28/20157/29/20157/29/2015 10:16:14 AMAPASS
Underground flush passed
FIR15-00218 INSP-Supply line flush7/28/20157/29/20157/29/2015 10:15:34 AMAPASS
Underground flush passed
FIR15-00219 INSP-Supply line flush7/28/20157/29/20157/29/2015 10:14:40 AMAPASS
Underground flush passed
FIR15-00221 INSP-Supply line flush7/28/20157/29/20157/29/2015 10:13:42 AMAPASS
Underground flush passed
FIR15-00222 INSP-Supply line flush7/28/20157/29/20157/29/2015 10:13:00 AMAPASS
Underground flush passed
FIR15-00223 INSP-Supply line flush7/28/20157/29/20157/29/2015 10:12:19 AMAPASS
Underground flush passed
FIR15-00220 INSP-Supply line flush7/28/20157/29/20157/29/2015 10:11:17 AMAFAIL
Could not do the underground flush since the water was not turned on.
FIR15-00437 INSP-Final Inspection7/28/20157/29/20157/29/2015 8:59:38 AMAFAIL
The two alarm pressure switches on the risers in D&B have been incorrectly set up as non-latching
BLD15-00796 FIRE-Final Inspection7/29/20157/29/20157/29/2015 12:00:00 AMPCANC
Jim Phone #: ###-####