BLD15-02105
| BLD-Conference | 7/29/2015 | 7/29/2015 | 7/30/2015 9:17:27 AM | P | PASS |
|
|
Received soils test report. Structural fill has been tested and passed. Ok for concrete.
|
BLD15-00249
| BLD-Footing | 7/28/2015 | 7/29/2015 | 7/29/2015 5:01:40 PM | P | PASS |
|
|
Manuel Phone #: ###-####
|
BLD15-00237
| BLD-Footing | 7/28/2015 | 7/29/2015 | 7/29/2015 5:00:27 PM | P | PASS |
|
|
Manuel Phone #: ###-####
|
GCB14-00171
| GCB-Final | 7/29/2015 | 7/29/2015 | 7/29/2015 3:01:24 PM | P | PASS |
|
|
Mike ###-####. structural final only ok.
|
GCB15-00088
| GCB-Framing | 7/29/2015 | 7/29/2015 | 7/29/2015 2:30:52 PM | P | PASS |
|
|
Ron ###-####. INterior steel stud framed walls only.
|
BLD15-01833
| BLD-Wall Bracing | 7/28/2015 | 7/29/2015 | 7/29/2015 1:58:09 PM | P | FAIL |
|
|
Early afternoon - Brett Phone #: ###-####. Install missing blocks and staple missed shear panels.
|
BLD15-00068
| BLD-Framing/Rough-in | 7/28/2015 | 7/29/2015 | 7/29/2015 11:53:58 AM | A | FAIL |
|
|
Josh phone ###-####. Noted no engineering to coorect any of the wall bracing issues from previous inspection and correction notice. Portal frame nailing not complete. Provide h2.5 on interior bearing on T40, T41 and T42 trusses. Provide an approved fix from truss engineer for T46 truss. Provide (2) 2x at interior bearing for 2ply T02. Complete lateral bracing on on 2ply T47 and instsall the required bearing blocks. South bearing on trussesT17 thru T21 and J02 thru J05 aRE BEARING AT THE INCOORECT LOCATION. Provide approved fix or that the beaRING location ids ok from truss engineer. Provide blocking at interior bearing for t36 thru t39 trusses and h2.5. Fireblock the concealed space in garage above electrical panel at ceiling level. A correction notice has been posted. No insulation or exterior cover at this time.
|
BLD15-02105
| BLD-Footing | 7/29/2015 | 7/29/2015 | 7/29/2015 11:45:44 AM | A | PART |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. Footings ok. Noted that approx. 1ft. of sandy gravel was placed and compacted. Will be ok for concrete once the fill has been tested and passed and report emailed showing passing results.
|
GCB14-00160
| GCB-Framing | 7/28/2015 | 7/29/2015 | 7/29/2015 9:50:16 AM | A | PASS |
|
|
Ed ###-####
|
BLD15-02326
| BLD-Conference | 7/27/2015 | 7/29/2015 | 7/29/2015 8:44:07 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Scott Smith
|
BLD15-02326
| DOC - Permit Finaled | 7/29/2015 | 7/29/2015 | 7/29/2015 8:43:50 AM | P | PASS |
|
|
All work appeared to be done in compliance with local codes and ordinances.
|