ELE13-01914
| ELE-Aging Inspection | 7/29/2016 | 7/29/2016 | 8/5/2016 2:30:38 PM | | PASS |
|
|
Able to see disconnecting means think listing sticker painted over.
|
ELE15-03901
| Final | 7/29/2016 | 7/29/2016 | 7/29/2016 3:11:20 PM | P | PART |
|
|
Call Rafael for TCO for floors 6 and 7. Phone #: ###-#### Inspection requested via web by Rafael Castillo temp final for stairways, corridors, egress floors 6 and 7
|
ELE16-02461
| Conference | 7/29/2016 | 7/29/2016 | 7/29/2016 3:04:46 PM | P | DONE |
|
|
Please call 30 minutes prior Phone #: ###-#### Inspection requested via web by John Edwards Discussed the installation of an auxillary gutter on outside of building to intercept 2 conduits . Want to manufacture gutter af sufficient size
|
ELE16-01853
| Final | 7/29/2016 | 7/29/2016 | 7/29/2016 1:47:25 PM | P | FAIL |
|
|
Any questions please call, thx Phone #: ###-#### Inspection requested via web by Stephen Kren 110.3- Switch in up hall miss wire shall be connected as per manufacturers instructions. 110.22- label switches for furnace disconnects. 210.52- Receptacle outlets shall be installed for each basin in down bath.
|
ELE16-01890
| Electrical Rough-In | 7/26/2016 | 7/29/2016 | 7/29/2016 12:33:55 PM | P | PASS |
|
|
Equipoytential Phone #: ###-#### Inspection requested via web by Louis Keller Perimeter bond rough in ok cover
|
ELE15-00495
| Electrical Rough-In | 7/28/2016 | 7/29/2016 | 7/29/2016 11:43:06 AM | A | PASS |
|
|
Ceiling rough in 1st floor. Service corridors. Contact is Toby Groves ###-####. Phone #: ###-#### Inspection requested via web by Toby Groves Rear elevator lobby grid and west service corridor grid rough in ok cover. West side of building sign whips shall terminate in a outdoor rated box
|
ELE16-00303
| Electrical Rough-In | 7/28/2016 | 7/29/2016 | 7/29/2016 11:39:33 AM | A | CANC |
|
|
Inspect wall trim out on 2nd and 3rd floor. Inspect for remaining items needed for a TCO for this TI space. Contact is Toby Groves ###-####. Phone #: ###-#### Inspection requested via web by Toby Groves Prewalk floors 2 and 3 ok for furniture. Thank you. Check corridor and stair lighting on both floors, remove flexible cord for temp power on 2, open boxes server rm, elec rm, 341, switch cover 342, west patio can trims, 3rd conference rm circiut inop, 368 furniture whip.
|
ELE16-02423
| Temporary Service | 7/28/2016 | 7/29/2016 | 7/29/2016 9:11:18 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Nelson t/s u/g n ok
|
ELE16-02426
| Final | 7/28/2016 | 7/29/2016 | 7/29/2016 9:10:45 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by David Nelson Needed temp service inspection
|
ELE16-02426
| Temporary Service | 7/29/2016 | 7/29/2016 | 7/29/2016 9:10:35 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Nelson t/s u/g n ok
|
ELE16-01134
| Electrical Rough-In | 7/28/2016 | 7/29/2016 | 7/29/2016 12:00:00 AM | A | PASS |
|
|
We are requesting a underground inspection in the alley way for tomorrow 7/29/16 late morning. Our contact on site is Bobby ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate east alley north 1/2 underground rough in ok cover. To verify with pictures areas not done. Scaffold will installed if issues with depth will address ofter scaffold gone.
|