ELE00-01001
| Electrical Rough-In | 6/30/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/30/2000 at 12:52:00. Contact: ###-####. done by 336 on 6-30-00 for a P/S 7/5/00 8:54:07 AM
|
ELE00-02501
| Rough-In Permanent Service | 6/30/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | A | PASS |
|
|
cl ###-#### R/I P?s U/g new ok 7/5/00 8:54:23 AM
|
ELE00-02505
| Temporary Service | 6/30/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | A | PASS |
|
|
###-#### O/H new 7/5/00 8:55:16 AM
|
ELE00-02507
| Rough-In Permanent Service | 6/30/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | A | NR |
|
|
ron ###-#### notice posted needs windows installed called no answer and no voice mail box set up to leave message 7/5/00 8:55:05 AM
|
ELE00-02083
| Electrical Rough-In | 7/3/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/03/2000 at 07:46:35. Contact: . correction posted see L7 for details 7/5/00 8:49:27 AM
|
ELE00-02506
| Electrical Rough-In | 7/3/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | P | CONF |
|
|
Scheduled by a contractor via Hello! on 07/03/2000 at 08:16:20. Contact: ###-####. conference only 7/5/00 8:49:58 AM
|
ELE00-02509
| Rough-In Permanent Service | 7/3/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | P | FAIL |
|
|
###-#### john correction posted ( called $42.00 reinspection fee due before reinspection ( please make note) 7/5/00 8:48:54 AM
|
ELE00-02485
| Rough-In Permanent Service | 6/30/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | P | PASS |
|
|
dave ###-#### u/g new ok 7/5/00 8:49:44 AM
|
ELE00-00147
| Permanent Service | 7/3/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | P | PART |
|
|
###-#### P/S O/H rec 7/5/00 8:50:22 AM
|
ELE00-02397
| Final | 7/3/2000 | 7/3/2000 | 6/29/2000 12:00:00 AM | A | PASS |
|
|
T/S U/G new
|