BLD00-01607
| BLD-Framing/Rough-in | 6/30/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | A | PASS |
|
|
###-#### ok to insulate-verbal corrections 7/3/00 11:08:58 AM
|
BLD00-01667
| BLD-Framing/Rough-in | 6/30/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/30/2000 at 14:24:00. Contact: . verbal corrections 7/3/00 11:08:17 AM
|
BLD00-00760
| BLD-Final | 6/30/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | A | FAIL |
|
|
ken ###-#### not ready-c/n- temp glass-floor joist 7/3/00 11:07:23 AM
|
BLD99-02751
| BLD-Final | 6/30/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | A | FAIL |
|
|
bob ###-#### fire & L's not signed off-other items 7/3/00 11:07:48 AM
|
BLD99-03593
| BLD-Final | 6/30/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | P | PART |
|
|
doug ###-#### all ok except need terry records sign off 7/5/00 8:36:50 AM
|
BLD00-01706
| BLD-Framing/Rough-in | 7/3/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/03/2000 at 08:47:06. Contact: ###-####. not ready 7/3/00 11:08:03 AM
|
BLD00-01102
| BLD-Framing/Rough-in | 7/3/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | P | PART |
|
|
ceiling grid ###-#### air ducts need secured need to check later 7/5/00 8:37:46 AM
|
BLD99-03405
| BLD-Framing/Rough-in | 7/3/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | P | FAIL |
|
|
###-#### plans in truss engineering by fireplace c/n left 9 items 7/5/00 8:38:16 AM
|
BLD00-01687
| BLD-Footing | 7/3/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD99-03720
| BLD-Framing/Rough-in | 7/3/2000 | 7/3/2000 | 7/3/2000 12:00:00 AM | P | FAIL |
|
|
ceiling grid ###-#### call first items not finished on 1st c/n 7/5/00 8:37:17 AM
|
BLD00-00760
| BLD-Final | 7/3/2000 | 7/3/2000 | 6/30/2000 12:00:00 AM | P | FAIL |
|
|
need temp glass- misc. small items
|
BLD00-01667
| BLD-Conference | 7/3/2000 | 7/3/2000 | 6/30/2000 12:00:00 AM | P | CONF |
|
|
look @ roof
|