Inspections for the day of: Tuesday, July 3, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE01-02183 Final7/2/20017/3/20017/3/2001 12:00:00 AMAPART
###-#### concrete encased electrode ok for cover 7/3/2001 10:17:55 AM
ELE01-02139 Permanent Service7/2/20017/3/20017/3/2001 12:00:00 AMAPASS
reinspection Oliver ###-####
ELE01-02231 Final7/2/20017/3/20017/3/2001 12:00:00 AMAFAIL
###-#### key is under the mat see other inspection request response 7/3/2001 3:06:48 PM
ELE01-00825 Final7/2/20017/3/20017/3/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/02/2001 at 13:26:34. Contact: ###-####. ok 7/3/2001 10:53:07 AM
ELE01-01301 Final7/2/20017/3/20017/3/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/02/2001 at 13:27:29. Contact: ###-####. ok 7/3/2001 10:52:58 AM
ELE01-02228 Final7/2/20017/3/20017/3/2001 12:00:00 AMPFAIL
Brian Elliot ###-#### called left number, still needs to install breaker at p/s 7/3/2001 1:46:47 PM
ELE01-02168 Electrical Rough-In7/3/20017/3/20017/3/2001 12:00:00 AMPPASS
warren ###-#### reinspection corrections made ok 7/3/2001 5:29:07 PM
ELE01-02214 Final7/3/20017/3/20017/3/2001 12:00:00 AMPPASS
streetlight p/s u/g new ok 7/3/2001 1:08:38 PM
ELE01-02235 Rough-In Permanent Service7/3/20017/3/20017/3/2001 12:00:00 AMPPASS
###-#### addition no p/s sub panel and r/i ok 7/3/2001 5:15:14 PM
ELE01-02231 Final7/3/20017/3/20017/3/2001 12:00:00 AMPFAIL
###-#### key under mat or unlocked cor. posted called new outlet in dinning shall be grounded and on a appliance circuit, same for new wiring in master bed, and bath additions and install all covers 7/3/2001 3:04:27 PM
ELE01-02237 Final7/3/20017/3/20017/3/2001 12:00:00 AMPFAIL
Trailer and R.V. Park Spaces A & B east end-###-#### Replacement pedestals cor.posted called u/g covered before inspection can not locate grd rods no access to new services without turning off power, p/s needs main and grounded properly as NEC states in Art 250 7/3/2001 4:40:47 PM