BLD01-01125
| BLD-Aging Inspection | 7/3/2001 | 7/3/2001 | 7/3/2001 12:00:00 AM | | CANC |
|
|
|
MEC01-01061
| Final | 7/3/2001 | 7/3/2001 | 7/3/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 415 On 7/3/2001 11:01:57 AM
|
BLD01-00246
| BLD-Final | 6/29/2001 | 7/3/2001 | 7/3/2001 12:00:00 AM | A | PART |
|
|
###-####
part c of c issued for 892 side only 7/3/2001 11:11:03 AM
|
BLD01-01680
| BLD-Foundation | 7/2/2001 | 7/3/2001 | 7/3/2001 12:00:00 AM | A | PART |
|
|
rebar ###-####
c/n posted, not per engineering 7/3/2001 3:05:41 PM
|
BLD01-01734
| BLD-Footing | 7/2/2001 | 7/3/2001 | 7/3/2001 12:00:00 AM | A | PART |
|
|
###-####
basement ftgs 7/3/2001 9:49:07 AM
|
MEC01-01901
| Pressure Test | 7/2/2001 | 7/3/2001 | 7/3/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/02/2001 at 12:00:24. Contact: ###-####.done by 411 7/3/2001 3:14:39 PM
|
BLD01-01421
| BLD-Framing/Rough-in | 7/2/2001 | 7/3/2001 | 7/3/2001 12:00:00 AM | A | PART |
|
|
Larry ###-####
ext. shear ok, inside frame ok pending trades 7/3/2001 10:00:26 AM
|
BLD01-01536
| BLD-Footing | 7/2/2001 | 7/3/2001 | 7/3/2001 12:00:00 AM | A | PART |
|
|
###-####garage ftgs ok w/ verbal corrections 7/3/2001 9:37:27 AM
|
BLD01-01167
| BLD-Foundation | 7/2/2001 | 7/3/2001 | 7/3/2001 12:00:00 AM | A | PART |
|
|
###-####
pouring 7/3/2001 11:14:47 AM
|
BLD01-01689
| BLD-Conference | 7/2/2001 | 7/3/2001 | 7/3/2001 12:00:00 AM | A | PASS |
|
|
for a conf--###-####- rick
conf. on framing, ftgs, etc 7/3/2001 10:23:55 AM
|
BLD01-01673
| BLD-Footing | 7/2/2001 | 7/3/2001 | 7/3/2001 12:00:00 AM | P | PART |
|
|
Jock, ###-####
wip, verbal corrections 7/3/2001 3:15:07 PM
|
BLD01-01352
| BLD-Energy code compliance | 7/3/2001 | 7/3/2001 | 7/3/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 415 On 7/3/2001 1:40:05 PM
|
BLD01-00682
| BLD-Energy code compliance | 7/3/2001 | 7/3/2001 | 7/3/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/03/2001 at 07:52:57. Contact: ###-####.
|
BLD01-01353
| BLD-Framing/Rough-in | 7/3/2001 | 7/3/2001 | 7/3/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/03/2001 at 08:29:32. Contact: ###-####.
ext shear ok 7/3/2001 1:22:32 PM
|
BLD01-01352
| BLD-Framing/Rough-in | 7/3/2001 | 7/3/2001 | 7/3/2001 12:00:00 AM | P | PASS |
|
|
Gary ###-####
energy code ok 7/3/2001 1:39:28 PM
|
BLD01-01124
| BLD-Framing/Rough-in | 7/3/2001 | 7/3/2001 | 7/3/2001 12:00:00 AM | P | PASS |
|
|
###-####
ok to insulate, verify energy seal package 7/3/2001 3:17:12 PM
|