PLM02-01966
| Groundwork | 7/2/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | A | PASS |
|
|
RENE ###-####
|
PLM02-01417
| Plumbing Rough-in | 7/2/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/02/2002 at 14:58:10. Contact: ###-####.
|
PLM02-01969
| Sprinkler (Final) | 7/2/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | P | PASS |
|
|
backflow doug- ###-####
|
PLM02-01265
| Final | 7/3/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | P | PART |
|
|
###-####
|
PLM02-01141
| Final | 7/3/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | P | CANC |
|
|
Added by Inspector: 309 On 7/3/2002 3:00:04 PM
|
PLM02-01141
| Final | 7/3/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 309 On 7/3/2002 3:08:07 PM ###-####, lori 7/3/2002 3:09:08 PM
|