ELE02-02034
| Electrical Rough-In | 7/2/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | A | PART |
|
|
STEVE ###-#### TRENCH / CONDUET ok 7/3/2002 10:05:49 AM
|
ELE02-01541
| Final | 7/2/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | A | PART |
|
|
KENNY ###-#### temp only x-ray not to be used till it is field tested by testing lab, it is not listed. Test will be done within 30 days 7/3/2002 10:18:31 AM
|
ELE02-01654
| Final | 7/2/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/02/2002 at 12:38:29. Contact: ###-####. ok card signed 7/3/2002 5:41:29 PM
|
ELE02-02018
| Permanent Service | 7/2/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | A | PASS |
|
|
joe- ###-#### conference ok
p/s o/h rec. ok 7/3/2002 10:46:17 AM
|
ELE02-02032
| Final | 7/2/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | A | PASS |
|
|
fn -mike- ###-#### r/i ok 7/3/2002 12:16:57 PM
|
ELE02-01837
| Electrical Rough-In | 7/1/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | A | PART |
|
|
###-####- john walls in basement ok 7/3/2002 11:47:26 AM
|
ELE02-02023
| Rough-In Permanent Service | 7/2/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | P | FAIL |
|
|
ALAN ###-#### 110.14 ringed wire meter, 314.20 boxes shall be set out 1/2 inch, 300.4 11/4 inch on studs, 210.52(A) needs outlet wall space in upstairs bed rm and living rm by stairs cor. posted called 7/3/2002 1:01:45 PM
|
ELE02-02033
| Final | 7/2/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | P | FAIL |
|
|
fn brad- ###-####--calvary chapel bld #4154 yrds s.w. of main bld( a little more than s.)1st door closet to the roll up door, 2nd door on the left which is 7 paces to the w., 6 paces s to 1st bathroom, 4 paces s to 2nd bathroom what does this message mean? called left message to have contractor call me ,I need information 7/3/2002 6:29:50 PM
|
ELE02-02005
| Temporary Service | 7/3/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/03/2002 at 07:57:58. Contact: ###-####.
t/s u/g new ok 7/3/2002 12:28:00 PM
|
ELE02-02036
| Electrical Rough-In | 7/3/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | P | FAIL |
|
|
todd-###-#### 7/3/2002 cor. posted called 300.4 (A&D) also no address, or plans at job site 7/3/2002 5:26:53 PM
|
ELE02-01436
| Final | 7/3/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/03/2002 at 08:25:44. Contact: ###-####. ok 7/3/2002 5:27:21 PM
|
ELE02-01832
| Electrical Rough-In | 7/3/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | P | PART |
|
|
NOLAN ###-#### walls upstairs, and walls and ceiling downstairs back of building 7/3/2002 2:51:43 PM
|
ELE02-01896
| Electrical Rough-In | 7/3/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | P | PART |
|
|
ADRIAN- HOMEOWNER ###-####-UNDERGROUND ok and concrete encased electrode ok 7/3/2002 3:09:03 PM
|
ELE01-03617
| Electrical Rough-In | 7/3/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | P | PART |
|
|
conference ok met Dennis clearence in electrical rm
|
ELE02-02003
| Electrical Rough-In | 7/3/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | P | PASS |
|
|
r/i ok corrections made
|