Inspections for the day of: Wednesday, July 3, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01180 BLD-Framing/Rough-in7/2/20027/3/20027/3/2002 12:00:00 AMAPART
john- ###-#### shear Shear OK. 7/4/2002 5:07:23 AM
BLD02-01444 BLD-Framing/Rough-in7/2/20027/3/20027/3/2002 12:00:00 AMAPASS
fr ben- call 1st before insp ###-####
BLD02-01492 BLD-Foundation7/2/20027/3/20027/3/2002 12:00:00 AMAPASS
found wall chris ###-####
BLD02-00243 BLD-Final7/2/20027/3/20027/3/2002 12:00:00 AMAPASS
PAT ###-#### C/C issued. 7/3/2002 10:56:15 PM
BLD02-01475 BLD-Foundation7/3/20027/3/20027/3/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/03/2002 at 05:32:45. Contact: .
BLD02-01459 BLD-Foundation7/3/20027/3/20027/3/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/03/2002 at 05:33:57. Contact: .
BLD02-01472 BLD-Foundation7/3/20027/3/20027/3/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/03/2002 at 05:35:04. Contact: .
BLD02-01055 BLD-Foundation7/3/20027/3/20027/3/2002 12:00:00 AMPPART
Substantial completion of walls....(crawl). 7/4/2002 3:16:40 AM
MEC02-01820 Rough-in7/3/20027/3/20027/3/2002 12:00:00 AMPPASS
###-#### rich Gas test OK. 7/4/2002 1:31:45 AM
BLD02-01509 BLD-Final7/3/20027/3/20027/3/2002 12:00:00 AMPFAIL
JOHN ###-#### NR...Need Electr, load hinges, complete step, nail rock....verbal. 7/4/2002 2:12:10 AM
BLD02-01463 BLD-Footing7/3/20027/3/20027/3/2002 12:00:00 AMPPART
LOGAN ###-####