MEC02-00840
| Pressure Test | 7/2/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | A | PART |
|
|
4 of 5 test ok, need 60# test on welded 7/3/2002 11:26:56 AM
|
MEC02-00410
| Final | 7/2/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | A | PART |
|
|
gas and hydronics final 7/3/2002 10:28:25 AM
|
MEC02-01762
| Pressure Test | 7/2/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | A | PASS |
|
|
###-#### steve
|
MEC02-01813
| Final | 7/2/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | P | PASS |
|
|
###-#### cindy
|
MEC02-01276
| Rough-in | 7/3/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | P | PASS |
|
|
alan- ###-####
|
MEC02-01818
| Rough-in | 7/3/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | P | FAIL |
|
|
locked up 7/3/2002 1:37:06 PM
|
MEC02-01808
| Rough-in | 7/3/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/03/2002 at 11:00:06. Contact: ###-####.
|
MEC02-01757
| Rough-in | 6/27/2002 | 7/3/2002 | 7/3/2002 12:00:00 AM | P | FAIL |
|
|
no f/p installed 7/3/2002 2:02:16 PM
|