Inspections for the day of: Wednesday, July 3, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00856 BLD-Framing/Rough-in7/1/20027/3/20027/3/2002 12:00:00 AMAFAIL
###-####needs new truss details.no inspection done. c/n on site. 7/3/2002 1:59:12 PM
BLD02-00854 BLD-Framing/Rough-in7/1/20027/3/20027/3/2002 12:00:00 AMAFAIL
###-####. garage hold downs are not installed correctley left c/n for engineer review, rest of house ok ,do not side garage front wing walls. 7/3/2002 12:08:01 PM
BLD02-00858 BLD-Framing/Rough-in7/1/20027/3/20027/3/2002 12:00:00 AMAPASS
###-####
BLD02-01046 BLD-Framing/Rough-in7/1/20027/3/20027/3/2002 12:00:00 AMAFAIL
###-####The front bay is not completed as er enginnering c/n posted. 7/3/2002 1:59:59 PM
BLD02-01148 BLD-Framing/Rough-in7/2/20027/3/20027/3/2002 12:00:00 AMAFAIL
###-#### steve . No plans at the site left ac/n posted to provide plans alsocalled this number no answer. 7/3/2002 10:50:45 AM
BLD02-01568 BLD-Footing7/3/20027/3/20027/3/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 07/03/2002 at 07:05:51. Contact: ###-####.Reviewed plans for the lateral anaylisis. footing requirements for the front doors has been written ,and is unclear does not make any since, I called the engineer and he told me what he wanted and I told him this was unusual for a pole barn next time detail this to avoid any complications , as now the holes have to be dug deeper and a second inspection will be required. Also not plan check does not ask for enogh detail. 7/3/2002 10:29:54 AM
BLD02-01209 BLD-Framing/Rough-in7/3/20027/3/20027/3/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 07/03/2002 at 07:58:43. Contact: ###-####.c/n posted. 7/3/2002 3:55:08 PM
BLD02-01495 BLD-Framing/Rough-in7/3/20027/3/20027/3/2002 12:00:00 AMPPASS
fr insp- ###-####- david . The micro-lams are in place, the wall has full length studs. Note the (2) 9-1/2 micro lam beam supports nothing except a gable truss. very little load. 7/3/2002 3:54:17 PM
BLD01-01935 BLD-Framing/Rough-in7/3/20027/3/20027/3/2002 12:00:00 AMPPART
###-####. framing c/n ok only item left is some mis fire blocking, will check at insulation completion contractor on site notified. Also needs mec approved.7/3/2002 2:18:48 PM 7/3/2002 2:19:03 PM
BLD02-01568 BLD-Footing7/3/20027/3/20027/3/2002 12:00:00 AMPPASS
front footings are now 5 foot deep, Niticed contractor framing girts flat plans call for girts on edge, as per engineering. Or have engineer ok as built. 7/3/2002 4:07:03 PM
BLD01-03225 BLD-Framing/Rough-in7/3/20027/3/20027/3/2002 12:00:00 AMPPART
NICK ###-#### -FR. interior shear ok. 7/3/2002 2:20:25 PM