Inspections for the day of: Thursday, July 3, 2003.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE03-01544 Final7/1/20037/3/20037/3/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 7/1/2003 at 3:17:51 PM. Contact: ###-####. ok 7/3/2003 8:31:35 AM
ELE03-01913 Final7/2/20037/3/20037/3/2003 12:00:00 AMAPASS
kevin; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok 7/3/2003 10:04:36 AM
ELE03-01786 Conference7/2/20037/3/20037/3/2003 12:00:00 AMAPART
jerry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok 7/3/2003 9:25:05 AM
ELE03-01564 Electrical Rough-In7/2/20037/3/20037/3/2003 12:00:00 AMAPASS
office; Phone #: ###-#### Internet Inspection Request from: Darla Downs ceiling ok 7/3/2003 10:31:43 AM
ELE03-01923 Permanent Service7/2/20037/3/20037/3/2003 12:00:00 AMAPASS
p/s o/h rec. ok 7/3/2003 4:10:26 PM
ELE03-01879 Electrical Rough-In7/3/20037/3/20037/3/2003 12:00:00 AMPPASS
Phone #: ###-#### Internet Inspection Request from: Justin Yount new laundry and bath in garage 7/3/2003 3:44:14 PM
ELE03-01965 Electrical Rough-In7/3/20037/3/20037/3/2003 12:00:00 AMPFAIL
###-#### or ###-#### dave cor. and do not cover posted called 300.4(A)(1)&(D) concrete encased electrode notapproved covered before in and not installed to meet NEC, can use 2 grd rods , 200.7(C)(1) shall ID white wire in romex as code states 7/3/2003 2:01:48 PM
ELE03-01176 Electrical Rough-In7/3/20037/3/20037/3/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 7/3/2003 at 10:05:15 AM. Contact: ###-####. ceiling ok for 2 restrms and hallway 7/3/2003 1:12:24 PM
ELE03-00398 Permanent Service7/2/20037/3/20037/3/2003 12:00:00 AMPPART
bud; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok 7/3/2003 12:51:02 PM
ELE03-00170 Electrical Rough-In7/2/20037/3/20037/3/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 7/2/2003 at 3:24:09 PM. Contact: ###-####. 2nd floor west end hard ceilings only cor. posted for low voltage wiring 1st floor, on building permit 7/3/2003 2:49:27 PM