BLD03-00904
| BLD-Concrete | 7/2/2003 | 7/3/2003 | 7/3/2003 12:00:00 AM | A | PART |
|
|
RJ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore rebar is in forms at about 75% 7/3/2003 9:51:21 AM
|
BLD03-00723
| BLD-Framing/Rough-in | 7/2/2003 | 7/3/2003 | 7/3/2003 12:00:00 AM | A | FAIL |
|
|
JOSH; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie no plans onsite no truss engineering on site need to install energy seal package no inspection done 7/3/2003 9:13:44 AM
|
MEC03-01631
| Rough-in | 7/2/2003 | 7/3/2003 | 7/3/2003 12:00:00 AM | A | PASS |
|
|
|
MEC03-01428
| Pressure Test | 7/2/2003 | 7/3/2003 | 7/3/2003 12:00:00 AM | A | FAIL |
|
|
KIRK; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie fourth time this has failed charge another reinspection fee 7/3/2003 11:01:36 AM
|
BLD03-01246
| BLD-Foundation | 7/2/2003 | 7/3/2003 | 7/3/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 7/2/2003 at 5:43:15 PM. Contact: ###-####. work in progress rebar in forms at about 25 % 7/3/2003 9:31:47 AM
|
MEC03-01084
| Final | 7/3/2003 | 7/3/2003 | 7/3/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/3/2003 at 5:56:36 AM. Contact: ###-####.
|
BLD03-00411
| BLD-Final | 7/3/2003 | 7/3/2003 | 7/3/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 7/3/2003 at 7:21:56 AM. Contact: ###-####. c/n on site 7/3/2003 10:26:12 AM
|
BLD02-03044
| BLD-Final | 7/2/2003 | 7/3/2003 | 7/3/2003 12:00:00 AM | A | FAIL |
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Barbara Moore needs tempered window by sliding door in bed room hand rail ends should have returns 7/3/2003 10:43:31 AM
|
BLD02-00090
| BLD-Wall cover | 7/2/2003 | 7/3/2003 | 7/3/2003 12:00:00 AM | P | PART |
|
|
alan; Phone #: ###-#### Internet Inspection Request from: Annette Moore third floor west half first floor elev loby se corner 7/7/2003 9:39:47 AM
|
BLD03-00723
| BLD-Framing/Rough-in | 7/3/2003 | 7/3/2003 | 7/3/2003 12:00:00 AM | P | FAIL |
|
|
josh; Phone #: ###-#### Internet Inspection Request from: Darla Downs no energy seal package installed no inspection done 7/3/2003 1:19:24 PM
|
BLD03-01026
| BLD-Foundation | 7/2/2003 | 7/3/2003 | 7/3/2003 12:00:00 AM | P | PART |
|
|
###-#### dennis all but three perm ftgs ok to pour 7/3/2003 3:46:32 PM
|
BLD03-01058
| BLD-Foundation | 7/2/2003 | 7/3/2003 | 7/3/2003 12:00:00 AM | P | PART |
|
|
###-#### dennis perm ftg ok to pour 7/3/2003 3:50:17 PM
|
BLD03-01059
| BLD-Foundation | 7/2/2003 | 7/3/2003 | 7/3/2003 12:00:00 AM | P | PART |
|
|
###-#### dennis ok to pour perm ftgs 7/3/2003 3:50:44 PM
|
BLD03-01230
| BLD-Foundation | 7/2/2003 | 7/3/2003 | 7/3/2003 12:00:00 AM | P | PASS |
|
|
clay; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|