FIR06-00958
| INSP-Sprinkler Rough-in/Hydro | 7/2/2007 | 7/3/2007 | 7/5/2007 10:02:56 AM | P | PASS |
|
|
I finished a hydro and overhead rough to cover inspection at Bonaventure Bldg. B
|
FIR06-00466
| INSP-Final Inspection | 7/2/2007 | 7/3/2007 | 7/3/2007 4:49:59 PM | P | FAIL |
|
|
The east riser flow switch still did not operate and the company that was to perform the manometer test did not show up.
|
FIR07-00461
| INSP-Sprinkler Rough-in | 7/3/2007 | 7/3/2007 | 7/3/2007 4:46:46 PM | P | PASS |
|
|
5'0" underground stub out is ok to cover
|
FIR07-00097
| INSP-Final Inspection | 7/3/2007 | 7/3/2007 | 7/3/2007 3:03:05 PM | P | PASS |
|
|
permit finaled. installation matches the resubmitted plans.
|
BLD07-00918
| FIRE-Final Inspection | 7/3/2007 | 7/3/2007 | 7/3/2007 3:01:59 PM | P | PASS |
|
|
Life safety passed.
|
FIR07-00484
| INSP-Sprinkler Rough-in | 7/2/2007 | 7/3/2007 | 7/3/2007 12:38:06 PM | A | FAIL |
|
|
The bury depth of the underground piping does not meet the minumum 4'6" bury depth. Since the next inspection will be the third I have applied a re-inspection fee
|
MIS07-00146
| FIR-Final | 6/29/2007 | 7/3/2007 | 7/3/2007 11:39:44 AM | A | PART |
|
|
A temporary occupancy was given until the approved door hardware is installed and the thumbturns removed. This applies to all of the tenant exit doors in the egress corridor.
|