FIR13-00268
| INSP-Alarm Testing | 7/2/2013 | 7/3/2013 | 7/3/2013 3:00:51 PM | P | NR |
|
|
On site visit to determine status of work in progress- FACP and NAC's installed, occupant notification verified at the first and second floors, offsite monitoring included. Noted missing MP at the 2nd floor stairway #2. Project not in condition for final acceptance testing at this time.
|
BLD13-01454
| FIRE-Conference | 7/3/2013 | 7/3/2013 | 7/3/2013 2:47:46 PM | P | DONE |
|
|
On site conference with tenant regarding exit signs at both levels, door hardware, premise identification.
|
FIR13-00120
| INSP-Final Inspection | 7/2/2013 | 7/3/2013 | 7/3/2013 2:46:05 PM | A | PASS |
|
|
Fire alarm work passed field inspection.
|
BLD13-00130
| FIRE-Final Inspection | 7/2/2013 | 7/3/2013 | 7/3/2013 9:44:59 AM | A | PASS |
|
|
Life safety final okayed.
|