FIR13-00257
| INSP-Sprinkler Rough-in/Hydro | 6/27/2013 | 6/28/2013 | | A | |
|
|
7:AM requested. (discussed with Troy) Phone #: ###-#### >> Inspection requested via web by Jason Babien
|
BLD12-02063
| FIRE-Final Inspection | 6/27/2013 | 6/28/2013 | | A | |
|
|
Steve Phone #: ###-####
|
FIR13-00020
| INSP-Sprinkler Rough-in | 7/3/2013 | 7/3/2013 | 7/3/2013 3:28:42 PM | P | PASS |
|
|
Vaulted ceiling area is ok to cover at 2018
|
FIR13-00204
| INSP-Sprinkler Rough-in | 7/2/2013 | 7/3/2013 | 7/3/2013 3:25:47 PM | A | CANC |
|
|
Cancel per Nate
|
BLD13-00661
| FIRE-Final Inspection | 7/2/2013 | 7/3/2013 | 7/3/2013 3:16:00 PM | A | CANC |
|
|
Cancel per Matt Hall Phone #: ###-####
|
FIR12-00717
| INSP-Sprinkler Rough-in | 7/2/2013 | 7/3/2013 | 7/3/2013 1:58:52 PM | A | PASS |
|
|
See the city approved plans for areas where the sprinkler rough-in passed.
|
FIR12-00695
| INSP-Sprinkler Rough-in | 7/2/2013 | 7/3/2013 | 7/3/2013 10:24:25 AM | A | PART |
|
|
See the city approved plans for rough-in inspection locations for today. Mostly passed but seismic restraint for the branchlines is missing is all location inspected today. Will need as-bults showing the new routing of the two 6" main in the service area. The car wash area piping size as installed does not match the approved plans.
|
FIR13-00017
| INSP-Final Inspection | 7/2/2013 | 7/3/2013 | 7/3/2013 10:13:28 AM | A | PASS |
|
|
Permit finaled
|
BLD13-01138
| FIRE-Final Inspection | 7/2/2013 | 7/3/2013 | 7/3/2013 9:35:17 AM | A | PART |
|
|
A temporary occupancy is approved by both scott and romeo until the access control and the high piled storage/racking is addressed.
|
BLD13-00978
| FIRE-Final Inspection | 7/2/2013 | 7/3/2013 | 7/2/2013 2:32:37 PM | A | FAIL |
|
|
Todays inspection actually turned into a more of a conference since the project related fire alarm permit is still in the REC status. Life safety will be ok to final when the project related fire alarm permit is finished, the emergency light in the stairwell is repaired and the correct hardware is installed on the restroom door. Mike wanted permission to begin installing office partitions and equipment so I deferred him to Scott for that approval. It does not appear that fire sprinkler work will be required.
|