ELE16-03342
| Final | 7/2/2017 | 7/3/2017 | 7/3/2017 11:47:54 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by cris flores Ok final. Contractor is going to remove 2 pole 20a and replace with panel blanks. Power will be disconnected to dryer/blower in downstairs bath.
|
ELE17-01784
| Final | 6/30/2017 | 7/3/2017 | 7/3/2017 10:04:26 AM | A | PASS |
|
|
Lester Phone #: ###-#### Ok final
|
ELE13-02096
| ELE-Aging Inspection | 7/3/2017 | 7/3/2017 | 7/3/2017 9:43:06 AM | | DONE |
|
|
Contractor has been notified a few times. No inspection requested at this time.
|
ELE13-02018
| ELE-Aging Inspection | 7/3/2017 | 7/3/2017 | 7/3/2017 9:13:39 AM | | FAIL |
|
|
No inspection requested at this time. Contractor has been notified a few times already
|
ELE17-01872
| Final | 6/30/2017 | 7/3/2017 | 7/3/2017 9:12:17 AM | A | PASS |
|
|
Ok final
|
ELE17-01833
| Electrical Rough-In | 6/30/2017 | 7/3/2017 | 7/3/2017 9:00:56 AM | A | PASS |
|
|
Contact: Rob Lawrence... ceiling inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover. Talked with Rob who is the contact. A few minor corrections need made, nothing that is life safety. A couple fixture whip on grid, and 2 j box covers need installed. All wires are safed off. West Ada School District is trying to get library finished asap.
|
ELE17-01481
| Final | 7/2/2017 | 7/3/2017 | 7/3/2017 9:00:55 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt ok final
|
ELE17-02018
| Final | 6/30/2017 | 7/3/2017 | 6/30/2017 4:11:11 PM | A | CANC |
|
|
If you have any questions please call Luke ###-####. Thanks!! Phone #: ###-#### >> Inspection requested via web by Clay Morgan Inspection cancelled from web by: Clay Morgan
|