ELE18-02291
| Electrical Rough-In | 7/2/2018 | 7/3/2018 | 7/3/2018 3:24:29 PM | P | PASS |
|
|
CONTACT NAME : JOSH MANGUM CEILING INSPECTION Phone #: ###-#### Inspection requested via web by Deb Gooden Grid rough in ok cover
|
ELE18-01817
| Electrical Rough-In | 7/3/2018 | 7/3/2018 | 7/3/2018 2:49:56 PM | P | PART |
|
|
Job Foreman: Jay Karel Phone #: ###-#### Inspection requested via web by Laurie Hoelscher Listing confirmed on wall mount only, only able to verify disconnecting means on free standing sign
|
ELE17-03734
| Conference | 7/2/2018 | 7/3/2018 | 7/3/2018 2:28:44 PM | P | FAIL |
|
|
Requesting an inspection consultation to review the panel wall that failed inspection previously. Specifically requesting Daryl to review any possible solutions to this issue. Phone #: ###-#### Inspection requested via web by Clint Tate As noted dedicated electrical space width and depth of panel board shall be clear for future expansion as per 110.26(E)(1)(a). As per conversation with Daryl DeGrange if only way to reconnect to pipes passing thru floor is in original area, only the amount permitted would be a 90 degree connector to leave dedicated electrical space.
|
ELE18-02470
| Temporary Service | 7/2/2018 | 7/3/2018 | 7/3/2018 12:28:28 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn t/s u/g n ok
|
ELE18-02450
| Rough-In Permanent Service | 7/2/2018 | 7/3/2018 | 7/3/2018 12:03:30 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn Rough in ok cover p/s u/g n ok
|
ELE18-02358
| Rough-In Permanent Service | 7/2/2018 | 7/3/2018 | 7/3/2018 12:02:36 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn Rough in ok cover p/s u/g n ok
|
ELE18-00727
| Final | 7/3/2018 | 7/3/2018 | 7/3/2018 11:33:50 AM | P | CANC |
|
|
Temp final Phone #: ###-#### >> Inspection requested via web by Tom Jenkins Inspection cancelled from web by: Tom Jenkins
|
ELE18-00727
| Final | 7/2/2018 | 7/3/2018 | 7/3/2018 11:26:48 AM | A | FAIL |
|
|
Temp final Phone #: ###-#### Inspection requested via web by Tom Jenkins 210.8(B)- Other Than Dwelling Units. All single-phase receptacles rated 150 volts to ground or less, 50 amperes or less and threephase receptacles rated 150 volts to ground or less, 100 amperes or less installed in the following locations shall have ground-fault circuit-interrupter protection for personnel. Multilple in kitchen area.
|
ELE18-01610
| Final | 7/3/2018 | 7/3/2018 | 7/3/2018 10:40:10 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Ron Zimmerman 210.8- All receptacles located in kitchen area shall have GFCI protection. Pizza oven, and 120 volt receptacles
|
ELE17-02862
| Electrical Rough-In | 7/3/2018 | 7/3/2018 | 7/3/2018 10:28:04 AM | A | PASS |
|
|
301 , 302 , 303 , 304 , 305 , 306 , 307 , 308 , 317 , 318 , 319 call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Rooms noted rough in ok cover
|
ELE18-02489
| Electrical Rough-In | 7/2/2018 | 7/3/2018 | 7/3/2018 9:44:04 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Discussed new permits needed for elevator. Electrical contractor has scope included in core and shell, elevator contractor will need seperate city and state permits. Underground conduits for new gear in basement rough in ok cover.
|