PLM18-02802
| Sprinkler (Final) | 7/3/2018 | 7/3/2018 | 7/3/2018 4:28:44 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Chad Sargent rp must be installed 12 inches above grade.
|
PLM18-02772
| Water and/or Sewer | 6/30/2018 | 7/3/2018 | 7/3/2018 4:08:24 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by zach vandenburg up to the water line crossing, offset will be done later, then north towards new building 80 feet or so.
|
MEC18-02287
| Final | 6/27/2018 | 7/3/2018 | 7/3/2018 3:28:35 PM | P | PASS |
|
|
PLEASE CALL JAMIE @ # LISTED WHEN EN ROUTE FOR PRESSURE/FINAL INSPECTION OF NEW GAS LINE RUN. PICTURES OF DITCH FILL-IN AVAILABLE UPON REQUEST. Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING
|
MEC18-02287
| Pressure Test | 6/27/2018 | 7/3/2018 | 7/3/2018 3:28:21 PM | P | PASS |
|
|
PLEASE CALL APPRENTICE JAMIE @ # LISTED WHEN EN ROUTE FOR FINAL INSPECTION ; PRESSURE TEST OF NEW GAS LINE RUN. CONTRACTOR HAS PICTURES OF FILLED IN DITCH SITES. Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING 20# test on future gas to new shop, not connected at either end.
|
MEC18-03055
| Pressure Test | 7/3/2018 | 7/3/2018 | 7/3/2018 3:11:41 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak ri fp 20# ok
|
MEC18-03055
| Rough-in | 7/3/2018 | 7/3/2018 | 7/3/2018 3:11:19 PM | P | PASS |
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak ri fp 20# test ok
|
PLM18-02408
| Final | 7/3/2018 | 7/3/2018 | 7/3/2018 2:43:19 PM | P | PASS |
|
|
if questions call Ryan @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
PLM18-02717
| Water Heater Final | 6/27/2018 | 7/3/2018 | 7/3/2018 2:19:47 PM | P | FAIL |
|
|
Please call Loraine when on way at ###-#### Phone #: ###-#### Inspection requested via web by JEREMY LINK needs 3 screws at each joint on flue
|
PLM18-01957
| Plumbing Rough-in | 7/2/2018 | 7/3/2018 | 7/3/2018 1:59:36 PM | P | PASS |
|
|
James Phone #: ###-#### med gas dwv water ri ok
|
PLM18-01971
| Groundwork | 7/2/2018 | 7/3/2018 | 7/3/2018 1:28:52 PM | P | PART |
|
|
If there are any questions please contact Tom P. at ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann test on the gw ok no plans yet proceed at your own risk
|
PLM18-02772
| Water and/or Sewer | 7/3/2018 | 7/3/2018 | 7/3/2018 11:29:32 AM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by zach vandenburg partial sewer tie in to half way down the east side of the building. Will cover as they go from here. I questioned the grade but we went through and shot the cleanpouts and they have the 1%.
|
PLM17-02369
| PLM-Aging Inspection | 7/3/2018 | 7/3/2018 | 7/3/2018 10:00:37 AM | | PEND |
|
|
no word
|