ELE18-00925
| Final | 7/3/2018 | 7/3/2018 | 7/3/2018 1:10:28 PM | P | PASS |
|
|
For access please call Ed 1/2 hr prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Terry Scott Ok final. Most of house re-modeled. All new TR recepts installed throughout new areas. New A/C max fuse 40 fed with 40a brkr. Existing panel, lockouts installed for micro, DW ,and oven.
|
ELE18-02491
| Temporary Service | 7/3/2018 | 7/3/2018 | 7/3/2018 12:47:43 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman t/s o/h n ok
|
ELE18-00849
| Electrical Rough-In | 7/2/2018 | 7/3/2018 | 7/3/2018 12:19:07 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok to one side for panel room, and mechanical. Conduits will be surface mounted.
|
ELE18-02483
| Temporary Service | 7/2/2018 | 7/3/2018 | 7/3/2018 11:58:24 AM | A | PASS |
|
|
Overhead temp pole Inspection requested via web by TOM BICANDI t/s o/h n ok
|
ELE18-02476
| Final | 7/2/2018 | 7/3/2018 | 7/3/2018 11:33:15 AM | A | PASS |
|
|
Relocated A/C circuit. Added service outlet, Jason is our contact, ###-#### Phone #: ###-#### Inspection requested via web by Kelly Felin Ok final. 40a brkr feeding disc with 35a fuses for A/C max allowable.
|
ELE18-02473
| Electrical Rough-In | 7/2/2018 | 7/3/2018 | 7/3/2018 10:35:08 AM | A | PASS |
|
|
Garage located behind residence. Phone #: ###-#### Inspection requested via web by Jose Guerrero Ok cover garage back of property.
|
ELE18-02340
| Electrical Rough-In | 7/2/2018 | 7/3/2018 | 7/3/2018 10:13:10 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by SHAWN TOMLINSON Ok cover garage.
|
ELE18-02495
| Final | 7/3/2018 | 7/3/2018 | 7/3/2018 9:32:01 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Eric White Talked to homeowner about re-locating disconnect so as it is within sight of equipt, and within 50ft of motor controller for pool cover.
|
MIS18-00253
| Set Bond Amount | 7/2/2018 | 7/3/2018 | 7/3/2018 9:29:58 AM | A | DONE |
|
|
Re-schedule for 7/3/18. To busy. One man on vacation. Stopped and talked to homeowner. Bens Electric doing electrical work. Gave untill the end of Thurs. the 5th of July to pull permit for electrical work being done.
|
ELE17-03929
| Electrical Rough-In | 7/2/2018 | 7/3/2018 | 7/3/2018 8:55:16 AM | A | PASS |
|
|
Please inspect floor heat for cover, 3 bathrooms on second floor. Thank You!! Phone #: ###-#### Inspection requested via web by Robert Schroder Ok cover floor heat 3 baths up.
|