FIR18-00397
| INSP-Final Inspection | 7/2/2018 | 7/3/2018 | 7/3/2018 3:08:15 PM | A | PASS |
|
|
Permit finaled
Contact is Sean. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
FIR15-00822
| INSP-Sprinkler Rough-in | 7/3/2018 | 7/3/2018 | 7/3/2018 1:51:34 PM | P | PART |
|
|
Todays inspection was for the bulk mains. Missing branchline restraints, missing heads in Fire Pump Room, missing earthquake bracing, missing clearance at CMU walls.
Tile can be installed in Service Bay but will need to be left out at the earthquake bracing locations.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00251
| INSP-Sprinkler Rough-in | 7/3/2018 | 7/3/2018 | 7/3/2018 1:48:49 PM | P | PASS |
|
|
Rough-in passed. piping can be covered.
Phone #: ###-#### Inspection requested via web by Jeff Packham
|
BLD18-02117
| FIRE-Final Inspection | 7/2/2018 | 7/3/2018 | 7/3/2018 8:58:12 AM | A | FAIL |
|
|
Remove the thumbturn deadbolt from the main exit, provide sticker at the main exit, provide current inspections for the fire extinguishers, mount no higher than 5' and be a min. size of 2A,10BC, provide tagged fire extinguisher for the second floor, provide racking permit for the storage racks over 8', contact Doug in Boise City Addressing for verification that the building address/suite number is ok.
Gene--backup cell number is ###-#### Phone #: ###-####
|
FIR18-00405
| INSP-Final Inspection | 7/2/2018 | 7/3/2018 | 7/2/2018 2:58:42 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|