Inspections for the day of: Tuesday, July 3, 2018.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00397 INSP-Final Inspection7/2/20187/3/20187/3/2018 3:08:15 PMAPASS
Permit finaled

Contact is Sean. Phone #: ###-#### Inspection requested via web by Morgan Ahten
FIR15-00822 INSP-Sprinkler Rough-in7/3/20187/3/20187/3/2018 1:51:34 PMPPART
Todays inspection was for the bulk mains. Missing branchline restraints, missing heads in Fire Pump Room, missing earthquake bracing, missing clearance at CMU walls.

Tile can be installed in Service Bay but will need to be left out at the earthquake bracing locations.

Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00251 INSP-Sprinkler Rough-in7/3/20187/3/20187/3/2018 1:48:49 PMPPASS
Rough-in passed. piping can be covered.

Phone #: ###-#### Inspection requested via web by Jeff Packham
BLD18-02117 FIRE-Final Inspection7/2/20187/3/20187/3/2018 8:58:12 AMAFAIL
Remove the thumbturn deadbolt from the main exit, provide sticker at the main exit, provide current inspections for the fire extinguishers, mount no higher than 5' and be a min. size of 2A,10BC, provide tagged fire extinguisher for the second floor, provide racking permit for the storage racks over 8', contact Doug in Boise City Addressing for verification that the building address/suite number is ok.

Gene--backup cell number is ###-#### Phone #: ###-####
FIR18-00405 INSP-Final Inspection7/2/20187/3/20187/2/2018 2:58:42 PMACANC
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball