BLD18-02155
| FIRE-Final Inspection | 7/3/2018 | 7/3/2018 | 7/5/2018 6:56:13 AM | P | PASS |
|
|
No fire sprinkler modifications (Annual Inspection for fire sprinklers will be required NOV 2018), no fire alarm modifications, fire extinguishers are in place with current inspection tags. Final life fire safety inspection complete.
Michael Phone #: ###-####-please call with an approx meet time
|
FIR18-00119
| INSP-Conference | 7/3/2018 | 7/3/2018 | 7/3/2018 12:58:06 PM | P | DONE |
|
|
Fire conference complete for undeground supply.
|
FIR18-00119
| INSP-Sprinkler Rough-in | 7/2/2018 | 7/3/2018 | 7/3/2018 12:57:01 PM | P | CANC |
|
|
Request was for a conference on the underground, this request is cancelled.
Contact Brad Westbrook - ###-#### 30 Min prior to Insp. start, Brad needs this to be after 1PM if at all possible please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
FIR18-00021
| INSP-Supply line flush | 7/2/2018 | 7/3/2018 | 7/3/2018 12:21:16 PM | A | DONE |
|
|
Underground main line flush complete.
George Jess is the contact for this underground Hydro and Flush. An appointment has been scheduled with Jim Page for 10AM and with Gus with Suez. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD17-03614
| FIRE-Final Inspection | 7/2/2018 | 7/3/2018 | 7/3/2018 11:26:44 AM | P | FAIL |
|
|
FIre sprinkler inspection is not complete, building is in no way ready for life fire safety inspection.
No personnel other that construction personnel inside of building until life fire safety inspection is complete.
Please call Phil when on site. Phone #: ###-#### Inspection requested via web by Philip Allen
|
FIR18-00196
| INSP-Final Inspection | 7/3/2018 | 7/3/2018 | 7/3/2018 11:20:38 AM | P | CANC |
|
|
Fire alarm system is for fire sprinkler riser monitoring and HVAC shutdown, fire sprinkler system is not ready so fire alarm inspection cannot be completed, this inspection request is cancelled.
Phone #: ###-#### Inspection requested via web by Ken Webster
|
BLD18-00593
| FIRE-Final Inspection | 7/3/2018 | 7/3/2018 | 7/3/2018 10:57:03 AM | P | PASS |
|
|
Fianl life fire safety inspection complete.
they close at 3:00 so would like you to go before then-if you can''t make it please call them to let them know-thanks Phone #: ###-####
|
BLD17-01763
| FIRE-Final Inspection | 7/2/2018 | 7/3/2018 | 7/3/2018 10:38:38 AM | A | FAIL |
|
|
Fire alarm permit FIR18-00124 needs to be finaled before life fire safety can be performed.
Fire finals Phone #: ###-#### Inspection requested via web by Mike Beeson
|
FIR18-00492
| INSP-Sprinkler Rough-in | 7/2/2018 | 7/3/2018 | 7/3/2018 10:36:23 AM | A | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00021
| INSP-Sprinkler Rough-in/Hydro | 7/2/2018 | 7/3/2018 | 7/3/2018 10:11:15 AM | A | DONE |
|
|
Underground hydrostatic test witnessed, no pressure loss observed at contractor provided gauge.
George Jess is the contact for this Underground Hydro ; Flush. It has been discussed with Jim Page ; Gus with Suez. The appointment time is for 10AM., thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR17-00563
| INSP-Final Inspection | 7/2/2018 | 7/3/2018 | 7/3/2018 9:44:17 AM | A | PASS |
|
|
Final fire alarm inspection complete.
Please call 1/2 before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
|
BLD16-04392
| FIRE-Final Inspection | 7/2/2018 | 7/3/2018 | 7/3/2018 9:01:09 AM | A | FAIL |
|
|
Fire alarm permit FIR17-00230 needs to be inspected and finaled before life fire safety inspection can be completed.
call him if have any questions // Brandon Phone #: ###-####
|
FIR18-00390
| INSP-Final Inspection | 7/2/2018 | 7/3/2018 | 7/3/2018 8:59:39 AM | A | FAIL |
|
|
Tamper switches in vault are not hooked into the fire panel, wiring to vault is causing a ground fault.
Backflow valves are required to be electronically supervised.
Phone #: ###-#### Inspection requested via web by Nathan Price
|