BLD18-01546
| BLD-Footing | 7/3/2018 | 7/3/2018 | 7/3/2018 5:59:11 PM | P | CANC |
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection.
|
BLD18-00570
| BLD-Wall Bracing | 7/3/2018 | 7/3/2018 | 7/3/2018 5:58:30 PM | P | PART |
|
|
Exterior only- Work in progress
Provide floor truss engineering for missing beam and hold downs
|
BLD17-04671
| BLD-Framing/Rough-in | 7/3/2018 | 7/3/2018 | 7/3/2018 5:57:08 PM | A | CANC |
|
|
Need Engineering approval/fix for broken truss at master bedroom Need Mech rough in
|
BLD18-00535
| BLD-Energy code compliance | 7/2/2018 | 7/3/2018 | 7/3/2018 5:56:00 PM | A | PASS |
|
|
Corrections SAT...
|
BLD18-00566
| BLD-Energy code compliance | 7/2/2018 | 7/3/2018 | 7/3/2018 5:55:40 PM | A | PEND |
|
|
Pending Engineering fix for cut floor truss and gusset/stiffeners being installed
|
BLD18-01824
| BLD-Framing/Rough-in | 7/3/2018 | 7/3/2018 | 7/3/2018 1:09:36 PM | P | PASS |
|
|
Front offices and Demising wall
|
BLD18-00805
| BLD-Ceiling Grid Inspection | 7/2/2018 | 7/3/2018 | 7/3/2018 1:07:59 PM | P | PASS |
|
|
Requests 1PM - John Phone #: ###-####
|
BLD17-02817
| BLD-Ceiling Grid Inspection | 7/2/2018 | 7/3/2018 | 7/3/2018 1:07:43 PM | P | PASS |
|
|
Requests 1PM - John Phone #: ###-####
|
BLD18-00247
| BLD-Energy code compliance | 7/2/2018 | 7/3/2018 | 7/3/2018 11:44:46 AM | A | PASS |
|
|
Corrections SAT...
|
BLD17-02944
| BLD-Final | 7/2/2018 | 7/3/2018 | 7/3/2018 11:44:04 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Braxton Hansen
|
BLD17-02944
| DOC - Permit Finaled | 7/3/2018 | 7/3/2018 | 7/3/2018 11:43:47 AM | P | PASS |
|
|
|
BLD17-02944
| BLD-Blower Door Test Results | 7/3/2018 | 7/3/2018 | 7/3/2018 11:43:38 AM | A | DONE |
|
|
ACH50- 4.4
|
BLD17-02907
| BLD-Final | 7/2/2018 | 7/3/2018 | 7/3/2018 11:43:18 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Braxton Hansen
|
BLD17-02907
| DOC - Permit Finaled | 7/3/2018 | 7/3/2018 | 7/3/2018 11:43:09 AM | P | PASS |
|
|
|
BLD17-02907
| BLD-Blower Door Test Results | 7/3/2018 | 7/3/2018 | 7/3/2018 11:43:00 AM | A | DONE |
|
|
ACH50- 5.3
|
BLD17-04652
| BLD-Energy code compliance | 7/2/2018 | 7/3/2018 | 7/3/2018 11:16:37 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by justin reynolds
|
BLD18-00230
| BLD-Framing/Rough-in | 6/29/2018 | 7/3/2018 | 7/3/2018 11:12:28 AM | A | PART |
|
|
Exterior Sheathing. Assisted Living wing Partial, courtyard C
|