ELE19-02253
| Final | 7/1/2019 | 7/3/2019 | 7/3/2019 2:42:07 PM | P | PASS |
|
|
Install complete per approved plans; the stamped and approved plans are on site at the electrical panel in the garage; For any questions about the work done for this project, call Jed at ###-####; For any questions about the plans or design, call Ryan at ###-####; thanks guys
The homeowner may not be home but will leave the garage bay door completely open and Ryan King is only 15 minutes away if you would like me to meet you there. The back door into the back yard will also be open with no dogs/pets to see the inverter. Phone #: ###-#### Inspection requested via web by Ryan King...labelling, disconnect, and OCPD ok
|
ELE19-01455
| Final | 7/3/2019 | 7/3/2019 | 7/3/2019 2:14:36 PM | P | PASS |
|
|
We need an inspection around noon, could even be around 11am Phone #: ###-#### Inspection requested via web by Brecklee Brown... labelling, disconnect, and OCPD ok
|
ELE19-01455
| Electrical Rough-In | 7/2/2019 | 7/3/2019 | 7/3/2019 2:14:03 PM | P | PASS |
|
|
We need an inspection around noon, could even be around 11am Phone #: ###-#### Inspection requested via web by Brecklee Brown...UL listing verified
|
ELE19-00631
| Electrical Rough-In | 7/3/2019 | 7/3/2019 | 7/3/2019 1:29:59 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...underground for parking lot lights and LV to building
|
ELE17-00330
| ELE-Aging Inspection | 7/3/2019 | 7/3/2019 | 7/3/2019 12:47:05 PM | | FAIL |
|
|
contractor was contacted 4/3/19 about need for inspections...contractor making no attempt
|
ELE19-02478
| Rough-In Permanent Service | 7/2/2019 | 7/3/2019 | 7/3/2019 12:29:35 PM | P | PASS |
|
|
Please call Mitch Whited at ###-#### (cell #) 30 minutes prior. Phone #: ###-#### Inspection requested via web by Mitch Whited.. p/s o/h reconnect ok
|
ELE19-01545
| Final | 7/3/2019 | 7/3/2019 | 7/3/2019 12:11:04 PM | P | PASS |
|
|
garage code 3484 Phone #: ###-#### Inspection requested via web by Neal Rumsey.. corrections made..ok to final
|
ELE19-01265
| Final | 7/2/2019 | 7/3/2019 | 7/3/2019 11:51:36 AM | A | PASS |
|
|
Please call 20 min pryer for access...Joe Phone #: ###-#### Inspection requested via web by Joe Easley...ok to final
|
ELE19-02469
| Final | 7/2/2019 | 7/3/2019 | 7/3/2019 11:16:17 AM | A | PASS |
|
|
Change AC breaker to 20a from 30a for new efficient AC. GE breaker inside garage panel. Phone #: ###-#### Inspection requested via web by Jason Gaythwaite..ok to final
|
ELE19-02339
| Final | 7/3/2019 | 7/3/2019 | 7/3/2019 10:48:07 AM | P | PASS |
|
|
close permit...ok to final permit...work done under permit ELE19-02482
|
ELE19-02482
| Permanent Service | 7/3/2019 | 7/3/2019 | 7/3/2019 10:47:20 AM | P | PASS |
|
|
Service off over a year Phone #: ###-#### Inspection requested via web by Greg Idsinga... p/s u/g reconnect ok...power off over a year
|
ELE19-02177
| Final | 7/2/2019 | 7/3/2019 | 7/3/2019 10:42:17 AM | A | PASS |
|
|
Door code 17395 Phone #: ###-#### Inspection requested via web by Greg Idsinga... ok to final
|
ELE19-02446
| Final | 7/2/2019 | 7/3/2019 | 7/3/2019 10:21:16 AM | A | PASS |
|
|
homeowner has requested inspection as close to 10AM as possible Phone #: ###-#### Inspection requested via web by Calvin Bohrer... ok to final
|
ELE18-03866
| Final | 7/2/2019 | 7/3/2019 | 7/3/2019 9:53:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud... wiring method ok job complete ok to final
|
ELE19-01806
| Final | 7/2/2019 | 7/3/2019 | 7/3/2019 9:21:01 AM | A | PASS |
|
|
garage code 2468 Phone #: ###-#### Inspection requested via web by Darryn Coburn.. ok to final
|
ELE19-01729
| Final | 7/2/2019 | 7/3/2019 | 7/3/2019 8:45:57 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn...ok to final
|
ELE19-02026
| Electrical Rough-In | 7/2/2019 | 7/3/2019 | 7/3/2019 8:26:34 AM | A | CANC |
|
|
Laurie Johnson will meet for the rough in inspection. Phone #: ###-#### Inspection requested via web by John Johnson...customer called day of inspection to cancel...not ready...sending images of run under floor-ok
|
ELE19-02405
| Rough-In Permanent Service | 7/2/2019 | 7/3/2019 | 7/3/2019 8:25:23 AM | A | PASS |
|
|
Apparently I didn''t finish my inspection request for Monday, the insulators caulked and sealed. I apologize for the inconvenience but hope we can still get this inspected with the caulk in place. Phone #: ###-#### Inspection requested via web by Greg Traudt... rough in ok to cover p/s u/g new ok
|
ELE19-01511
| Final | 7/2/2019 | 7/3/2019 | 7/3/2019 12:16:22 AM | P | CANC |
|
|
access: 1027 Phone #: ###-#### >> Inspection requested via web by David Nelson Inspection cancelled from web by: David Nelson
|