BLD01-01174
| BLD-Energy code compliance | 7/18/2001 | 7/30/2001 | 7/30/2001 12:00:00 AM | A | FAIL |
|
|
###-####
c/n not done yet, insulation is not done, called builder to notify, he will recall after fix, reinspection fee will be imposed next time. 7/30/2001 10:51:34 AM
|
BLD00-03635
| BLD-Final | 7/27/2001 | 7/30/2001 | 7/30/2001 12:00:00 AM | A | FAIL |
|
|
call first ###-#### Bob
need hand rail on side entry, handrail per code on int. stairs, tempered glass @ master bath tub 7/30/2001 11:55:38 AM
|
BLD01-00159
| BLD-Final | 7/27/2001 | 7/30/2001 | 7/30/2001 12:00:00 AM | A | FAIL |
|
|
dave ###-#### fire is also going out
need trade sign offs, no inspection made 7/30/2001 10:41:58 AM
|
BLD98-01721
| BLD-Energy code compliance | 7/27/2001 | 7/30/2001 | 7/30/2001 12:00:00 AM | A | PASS |
|
|
###-#### tamura
framing ok, wip on insulation, ok to cover 7/30/2001 10:48:09 AM
|
BLD00-02594
| BLD-Conference | 7/27/2001 | 7/30/2001 | 7/30/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 415 On 7/27/2001 4:34:09 PM call rehab @ ###-####///mike met w/ them, paper work for loan is being filled out 7/31/2001 2:33:34 PM
|
BLD01-01702
| BLD-Foundation | 7/30/2001 | 7/30/2001 | 7/30/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/30/2001 at 06:55:50. Contact: ###-####.
corrections to be done b-4 pouring include fixing cololms per engineering, providing special inspections on welding, finish setting up per plan. 7/30/2001 10:47:24 AM
|
BLD99-02391
| BLD-Conference | 7/30/2001 | 7/30/2001 | 7/30/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 415 On 7/30/2001 9:52:52 AM
t/w Dale, advised him to go to city and reactivate permit and recall needed inspections to be in compliance 7/30/2001 10:43:57 AM
|
BLD01-00747
| BLD-Foundation | 7/30/2001 | 7/30/2001 | 7/30/2001 12:00:00 AM | P | PART |
|
|
John ###-####
special on site 7/31/2001 9:21:57 AM
|
BLD00-00298
| BLD-Conference | 7/30/2001 | 7/30/2001 | 7/30/2001 12:00:00 AM | P | PART |
|
|
jOHN dUNCAN ###-####
need plumbing and mechanical sign offs/ also seal firewall and need guard rail per code 7/30/2001 1:39:30 PM
|
BLD01-01729
| BLD-Footing | 7/30/2001 | 7/30/2001 | 7/30/2001 12:00:00 AM | P | PART |
|
|
###-####
wip, verbal corrections/warnings
7/30/2001 1:38:06 PM
|
BLD01-01837
| BLD-Footing | 7/30/2001 | 7/30/2001 | 7/30/2001 12:00:00 AM | P | PART |
|
|
###-####
wip, verbal corrections/ warnings///other pads in area may require compaction tests 7/30/2001 1:37:29 PM
|
BLD99-01551
| BLD-Final | 7/30/2001 | 7/30/2001 | 7/30/2001 12:00:00 AM | P | FAIL |
|
|
Contact Mark @ ###-#### for accessprior to inspection. conference only ///verbal list of corrections (owners rep. wrote down) to do before final. 7/31/2001 9:21:33 AM
|