ELE02-02357
| Final | 7/29/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | A | PART |
|
|
###-#### u/g for sign 7/30/2002 11:03:58 AM
|
ELE02-02197
| Electrical Rough-In | 7/29/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/29/2002 at 13:21:12. Contact: ###-####. conference ok only 7/30/2002 12:34:30 PM
|
ELE02-02316
| Rough-In Permanent Service | 7/29/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | A | FAIL |
|
|
; Phone #: ###-#### cor. posted called 300.4, 300.14, 210.52(A), 314.20, 250.148, 314.43, 334.24 kinks, and bends in cables less than 5 times diameter of cable. low voltage coe. posted for homeowner needs connector at all j boxes for ENT, cables need clamps at all boxes and cabinets, 314.20 , 314.43 7/30/2002 1:11:39 PM
|
ELE02-02098
| Final | 7/29/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | A | NH |
|
|
###-#### called notice posted 7/30/2002 10:33:30 AM
|
ELE02-00008
| Final | 7/29/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/29/2002 at 15:06:44. Contact: .
cor. posted called U A C 301.2.3 electrical permit required for contractor who did site lighting, 250.122 shall use #10 equip for # phase conductors, 410.15(B)(3) $5.00 fee due 7/30/2002 12:06:11 PM
|
ELE01-03113
| Electrical Rough-In | 7/30/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/30/2002 at 07:02:34. Contact: ###-####. ceiling cover ok 7/30/2002 11:39:01 AM
|
ELE02-01626
| Final | 7/30/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 07/30/2002 at 07:24:41. Contact: ###-####. called electrical contractor , and talked with general at job site sign contractor needs to call for inspection, also need panel schedules and complete wiring to cash wrap, cannot final with open wiring 7/30/2002 3:22:09 PM
|
ELE02-02001
| Final | 7/30/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | P | FAIL |
|
|
john ; Phone #: ###-#### cor. posted 110.26(F)(1) move panels , or remove water piping from below panel for required clearence, 250.104 shall bond hot and cold water piping 7/30/2002 5:32:31 PM
|
ELE02-01832
| Electrical Rough-In | 7/30/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/30/2002 at 11:22:48. Contact: ###-####. made up ok and ceiling cover ok 7/30/2002 4:39:37 PM
|
ELE02-02362
| Rough-In Permanent Service | 7/29/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | P | FAIL |
|
|
alan ###-#### cor. posted called 300.4 (A)(1) nail plates, 314.20 all boxes shall be flush with finish surface do not cover posted 7/30/2002 4:13:57 PM
|