PLM02-01736
| Final | 7/29/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | A | PASS |
|
|
###-#### don
|
PLM01-03641
| Final | 7/29/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/29/2002 at 15:52:51. Contact: ###-####. need thermal expansion tank, need to pipe t&p,s to floor drain , need hose bibb vacuum breaker on hydrant,s on roof need to have ice machine installed 7/30/2002 1:25:57 PM
|
PLM02-02020
| Sprinkler (Final) | 7/29/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/29/2002 at 16:01:29. Contact: ###-####.
|
PLM02-02214
| Sprinkler (Final) | 7/30/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | P | PART |
|
|
###-#### tie in ok ok to cover need two union,s on double check , provide gravel 6 inches below double check need to be tested and certified 7/30/2002 2:50:11 PM
|
PLM02-02213
| Sprinkler (Final) | 7/30/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | P | PART |
|
|
tie in ok ok to cover need to have bach flow device tested and certified need plug,s for test port,s need to provide gravel 6 inches below backflow double check 7/30/2002 2:47:36 PM
|
PLM02-01813
| Final | 7/30/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/30/2002 at 09:51:03. Contact: ###-####.
|
PLM02-00926
| Plumbing Rough-in | 7/30/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | P | PASS |
|
|
|