Inspections for the day of: Tuesday, July 30, 2002.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-01736 Final7/29/20027/30/20027/30/2002 12:00:00 AMAPASS
###-#### don
PLM01-03641 Final7/29/20027/30/20027/30/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 07/29/2002 at 15:52:51. Contact: ###-####. need thermal expansion tank, need to pipe t&p,s to floor drain , need hose bibb vacuum breaker on hydrant,s on roof need to have ice machine installed 7/30/2002 1:25:57 PM
PLM02-02020 Sprinkler (Final)7/29/20027/30/20027/30/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/29/2002 at 16:01:29. Contact: ###-####.
PLM02-02214 Sprinkler (Final)7/30/20027/30/20027/30/2002 12:00:00 AMPPART
###-#### tie in ok ok to cover need two union,s on double check , provide gravel 6 inches below double check need to be tested and certified 7/30/2002 2:50:11 PM
PLM02-02213 Sprinkler (Final)7/30/20027/30/20027/30/2002 12:00:00 AMPPART
tie in ok ok to cover need to have bach flow device tested and certified need plug,s for test port,s need to provide gravel 6 inches below backflow double check 7/30/2002 2:47:36 PM
PLM02-01813 Final7/30/20027/30/20027/30/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/30/2002 at 09:51:03. Contact: ###-####.
PLM02-00926 Plumbing Rough-in7/30/20027/30/20027/30/2002 12:00:00 AMPPASS