BLD02-01398
| BLD-Framing/Rough-in | 7/29/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | A | FAIL |
|
|
###-#### JIM . about 4 need adjustment. also signage. 7/30/2002 9:44:39 AM
|
BLD02-00019
| BLD-Framing/Rough-in | 7/29/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | A | FAIL |
|
|
###-#### SCOTTc/n 7/30/2002 10:42:13 AM
|
BLD02-01112
| BLD-Energy code compliance | 7/29/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | A | PASS |
|
|
###-#### russ
|
BLD01-01527
| BLD-Conference | 7/30/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | A | PART |
|
|
Issue 5 day N&O requireing CO. Talked with Clay about obtaining final he will comply, only missing fire at this time. 7/31/2002 12:08:51 PM
|
BLD02-00750
| BLD-Final | 7/29/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | P | FAIL |
|
|
###-#### cn posted on handrails and guardrails 7/30/2002 2:56:14 PM
|
BLD02-01734
| BLD-Footing | 7/29/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | P | PART |
|
|
###-####footing ok wall will be tight at rear and right side, need to check walls for set backs. 7/30/2002 2:07:07 PM 7/30/2002 2:07:28 PM
|
MEC02-02058
| Rough-in | 7/30/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/30/2002 at 08:27:30. Contact: ###-####.
|
MEC02-01150
| Final | 7/30/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/30/2002 at 08:27:49. Contact: ###-####.
|
MEC02-01170
| Final | 7/30/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | P | PASS |
|
|
randy ###-####sticker allrready on unit by 411. also a pass entered. 7/30/2002 1:27:55 PM
|
BLD02-01668
| BLD-Footing | 7/30/2002 | 7/30/2002 | 7/30/2002 12:00:00 AM | P | PART |
|
|
wes; Phone #: ###-####
|