Inspections for the day of: Wednesday, July 30, 2003.
Number of inspections: 2
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC03-00334 Site Preparation7/28/20037/30/20037/30/2003 12:00:00 AMAPART
JLR and SGW on site--pumping of water to vegative area occurring, appears to be ok for now. Parks (William Bennet-###-####) called with concerns of water running over green belt, as of now water only flowing in ditch directly south of green belt. This is ok with parks. Stop work lifted pending pumping operations to see if settleing ponds and 8" pipe to vegative area will work. Will monitor. 7/30/2003 10:25:15 AM 7/30/2003 10:26:02 AM
ESC03-00334 Site Preparation7/30/20037/30/20037/30/2003 12:00:00 AMPPART
SGW and L. Sommer discussed BMP's and reviewed current conditions. Additional bmp's were installed since a.m. Advised contractor to install geoTech, filter fabric etc on bare banks on ditches to reduce sediment. Rock check dams installed were adequate. All provisions to reduce sediment outflows to MEP. Maintain all bmp's and inspect outflows daily if not more for water clarity. Informed rp J. Conger and C. Weston BPD (###-#### x309). 7/30/2003 2:15:00 PM