Inspections for the day of: Friday, July 30, 2004.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy James
TitleMEC-COM/RES INSPECTOR
Phone #794-9461
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC04-01844 Rough-in7/29/20047/30/20047/30/2004 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
MEC04-01844 Pressure Test7/29/20047/30/20047/30/2004 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
BLD04-00669 BLD-Final7/29/20047/30/20047/30/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 7/29/2004 at 6:01:58 PM. Contact: ###-####.
BLD04-00483 BLD-Final7/29/20047/30/20047/30/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 7/29/2004 at 6:03:35 PM. Contact: ###-####.
BLD04-01006 BLD-Framing/Rough-in7/29/20047/30/20047/30/2004 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 7/29/2004 at 8:01:08 AM. Contact: ###-####. Need to strap top plates at beams in garage. Need truss calcs. 7/30/2004 11:11:20 AM
BLD03-02023 BLD-Final7/29/20047/30/20047/30/2004 12:00:00 AMPNH
robert; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
No access to house. Need bond set for landscaping per terry records. 7/30/2004 2:19:12 PM
BLD04-01661 BLD-Footing7/29/20047/30/20047/30/2004 12:00:00 AMPPASS
Troy, This is another deck. There are only 12 holes. The engineer did his testing of the holes today, Thursday, I am taking the letter to Terry Records on Friday morning. I would like to be able to pour concrete as soon after lunch as possible. We have to mix everything by hand on site so we will have a full afternoon. I really need the mud in the ground on Friday so I have the weekend to let it set up. Thank you, Jeff Ware ###-####; Phone #: ###-#### Internet Inspection Request from: Jeff Ware
BLD04-01572 BLD-Footing7/30/20047/30/20047/30/2004 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 7/30/2004 at 7:36:03 AM. Contact: ###-####. Need soils approval per hillside requirements per terry records. 7/30/2004 2:30:35 PM
BLD03-01204 BLD-Final7/30/20047/30/20047/30/2004 12:00:00 AMPPASS
Ron; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
MEC04-01988 Pressure Test7/30/20047/30/20047/30/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 7/30/2004 at 9:42:12 AM. Contact: ###-####.
BLD04-01189 BLD-Footing7/30/20047/30/20047/30/2004 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 7/30/2004 at 10:03:46 AM. Contact: ###-####.
MEC04-01673 Final7/30/20047/30/20047/30/2004 12:00:00 AMPPASS
stacy; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD03-02023 BLD-Final7/30/20047/30/20047/30/2004 12:00:00 AMPPASS
MEC04-00666 Final7/30/20047/30/20047/30/2004 12:00:00 AMPPASS