ESC06-01149
| Tracking Control | 7/27/2007 | 7/30/2007 | 7/30/2007 11:43:20 AM | A | PART |
|
|
Construction is underway. Talked to RP about watching track out from site and making sure that appropriate sediment barriers are in place.
|
ESC07-00818
| Site Final | 7/30/2007 | 7/30/2007 | 7/30/2007 11:39:50 AM | P | FAIL |
|
|
left vm for RP. access control needed from lot onto Nez Perce and some street sweeping is needed. Also want to know the status of rebuilding or stablization plans.
|
ESC07-00922
| Site Final | 7/30/2007 | 7/30/2007 | 7/30/2007 11:34:32 AM | P | PASS |
|
|
|