ELE08-00945
| Final | 7/30/2008 | 7/30/2008 | 7/30/2008 4:01:37 PM | P | PASS |
|
|
looked at signs, ok to final, no esc this project
|
ESC08-00415
| General Inspection | 7/30/2008 | 7/30/2008 | 7/30/2008 3:59:18 PM | P | PASS |
|
|
looked ok
|
ESC08-00607
| General Inspection | 7/30/2008 | 7/30/2008 | 7/30/2008 3:58:20 PM | P | PASS |
|
|
looked ok
|
ESC08-00035
| General Inspection | 7/30/2008 | 7/30/2008 | 7/30/2008 3:56:48 PM | A | PASS |
|
|
looked ok
|
ELE08-01567
| Electrical Rough-In | 7/30/2008 | 7/30/2008 | 7/30/2008 3:55:37 PM | P | NR |
|
|
Need Inspection on Potting compound -Final? Phone #: ###-#### Internet Inspection Request from: Lynn Cable just finished pool gunnite, could not get in to see potting, told to call for am inspection
|
ELE08-02116
| Electrical Rough-In | 7/30/2008 | 7/30/2008 | 7/30/2008 3:15:30 PM | A | CANC |
|
|
Mike ###-#### see conference
|
ELE08-02116
| Conference | 7/30/2008 | 7/30/2008 | 7/30/2008 2:40:36 PM | P | DONE |
|
|
Mike ###-#### met oener, talked about #8 solid copper for bonding, non-metallic pvc to pool lights, approved clamps for concrete encasement, burial depth for raceways
|
ELE08-01508
| Electrical Rough-In | 7/30/2008 | 7/30/2008 | 7/30/2008 1:55:27 PM | P | PART |
|
|
DON NOTE: 2ND FL - CEILING GRID COVER Phone #: ###-#### 2nd floor ceilings ok to cover anop except 4 rooms, no esc this project
|
ELE08-01564
| Final | 7/30/2008 | 7/30/2008 | 7/30/2008 1:00:18 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 7/30/2008 at 8:49:31 AM. Contact: ###-####. ok to final, signed occupancy card, no esc this project
|
ELE08-00900
| Conference | 7/30/2008 | 7/30/2008 | 7/30/2008 12:28:47 PM | P | DONE |
|
|
Scheduled by a contractor via Hello! on 7/30/2008 at 8:55:52 AM. Contact: ###-####. talked about abandoned fixtures ok to leave on original ceiling, said to remove tubes, no esc this project
|
ELE08-00900
| Electrical Rough-In | 7/30/2008 | 7/30/2008 | 7/30/2008 12:28:29 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 7/30/2008 at 8:55:52 AM. Contact: ###-####. ok to cover ceilings anop, no esc this project
|
ELE08-01674
| Final | 7/29/2008 | 7/30/2008 | 7/30/2008 10:43:48 AM | A | PASS |
|
|
Ed- call 30 min prior Phone #: ###-#### ok to final, no esc this project
|
ELE08-01683
| Electrical Rough-In | 7/29/2008 | 7/30/2008 | 7/30/2008 10:22:38 AM | A | PART |
|
|
contact: Chris Carmine - underground inspection please Phone #: ###-#### Internet Inspection Request from: Deb Gooden ok to cover u/g south side and east entry only, no esc this project
|
ELE08-01770
| Permanent Service | 7/29/2008 | 7/30/2008 | 7/30/2008 10:20:16 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Spencer Mclean called contractor, power on, no panel schedule per NEC 408.4 electrical permit not tied to bld, lock box on door no esc this project
|
ELE08-01532
| Electrical Rough-In | 7/29/2008 | 7/30/2008 | 7/30/2008 9:44:06 AM | A | PASS |
|
|
Contact: Neil Ramsey - roughin insoection for the 6th floor condo''s please Phone #: ###-#### Internet Inspection Request from: Deb Gooden ric ok 6th floor condos 601 thru 610
|
ELE08-01814
| Final | 7/29/2008 | 7/30/2008 | 7/30/2008 8:34:51 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Jenni Keller called contractor for abrasion protection, ok to final, no esc this permit, p/s u/g rec ok
|
ELE08-01029
| Final | 7/29/2008 | 7/30/2008 | 7/30/2008 8:00:18 AM | A | PART |
|
|
danny Phone #: ###-#### part of store anop ok to final, roof, a/h unit room, elect room, storage area, deli, bakery, will see rest of ceilings later
|