FIR08-00310
| INSP-Final Inspection | 7/30/2008 | 7/30/2008 | 7/30/2008 4:50:40 PM | P | PASS |
|
|
Fire alarm permit finaled.
|
FIR08-00209
| INSP-Final Inspection | 7/30/2008 | 7/30/2008 | 7/30/2008 4:21:01 PM | P | PASS |
|
|
Fire sprinkler permit finaled, repairs are complete.
|
FIR07-00606
| INSP-Sprinkler Rough-in | 7/30/2008 | 7/30/2008 | 7/30/2008 4:20:17 PM | P | FAIL |
|
|
Third reinspection for areas B and D plan sheet FP5 failed due to items including overspaced head at corridor A11, overspaced pendent at the girls locker room B40, missing branch line below the stairs at storage room B13 including three SSU heads, need intermediate temp. head adjacent to the supply register at girls room B38-noted per inspection completed 7/10, missing sprinkler coverage at the accessible mechanical room between mens B44 and womens B43 restrooms, notified general contractor to provide area separation between sprinklered and non-sprinklered areas at the storage room C228, one painted head replaced while on site. Ten item correction notice from yesterdays inspection is finished.
|
FIR08-00503
| INSP-Sprinkler Rough-in | 7/30/2008 | 7/30/2008 | 7/30/2008 2:40:29 PM | P | FAIL |
|
|
See approved plans for necessary corrections including six pendent heads which exceed min. separation, and hangers at three locations missing correct retaining strap attatchments.
|
FIR08-00508
| INSP-Final Inspection | 7/29/2008 | 7/30/2008 | 7/30/2008 2:34:54 PM | A | FAIL |
|
|
See fire code review notes item number seven for requirements.
|
FIR08-00461
| INSP-Sprinkler Rough-in | 7/28/2008 | 7/30/2008 | 7/30/2008 2:33:14 PM | A | FAIL |
|
|
Inspection for overhead fire sprinkler rough-in at the 7th floor failed due to changes in floorplan, piping layout, number, type and location of heads at several areas. Differences between field installation and approved plans are beyond what can normally be accepted on "as-built" drawings, will need to provide approved resubmittal plans including all changes. The installation appears acceptable, however documentation must be provided.
|
FIR08-00509
| INSP-Final Inspection | 7/29/2008 | 7/30/2008 | 7/30/2008 11:34:43 AM | A | FAIL |
|
|
Manual pull stations must be located no higher than 48" AFF to the operable part, see also review note #7 for details, functional testing delayed until repairs are finished.
|
FIR08-00518
| INSP-Final Inspection | 7/29/2008 | 7/30/2008 | 7/30/2008 10:49:22 AM | A | PASS |
|
|
Scope of work passed field inspection, minor field modifications accepted, permit finaled.
|
FIR08-00164
| INSP-Sprinkler Rough-in/Hydro | 7/29/2008 | 7/30/2008 | 7/30/2008 10:25:51 AM | A | PART |
|
|
UG fire supply line flush completed acceptable.
|
FIR08-00319
| INSP-Sprinkler Rough-in | 7/29/2008 | 7/30/2008 | 7/30/2008 10:23:53 AM | A | PART |
|
|
OH rough-in is approved for cover at the hard lid ceilings per red line plan annotations initialed with todays date at the school room #401.
|
FIR07-00606
| INSP-Sprinkler Rough-in | 7/29/2008 | 7/30/2008 | 7/30/2008 8:20:17 AM | A | CANC |
|
|
Jerry is the contact. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|
FIR08-00278
| FIR-Aging Inspection | 7/30/2008 | 7/30/2008 | 7/30/2008 8:07:38 AM | | DONE |
|
|
Work in progress, construction underway.
|