Inspections for the day of: Wednesday, July 30, 2008.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00530 Site Preparation7/30/20087/30/20087/30/2008 3:32:18 PMPPART
Need to containerize waste or remove everyday. Cannot leave on ground. Contractor moved and secured port-a-pot.
ESC08-00461 General Inspection7/30/20087/30/20087/30/2008 3:18:10 PMPPART
Verbal to RP, need sign lines filled out where they are legiable. Prepare to stabilize denuded soils if work has stopped.
ESC08-00530 Site Preparation7/30/20087/30/20087/30/2008 3:12:37 PMPCANC
duplication of inspection
ESC04-00150 Site Final7/30/20087/30/20087/30/2008 2:46:37 PMPPASS
ESC04-00150 Site Final7/30/20087/30/20087/30/2008 2:46:20 PMPPASS
ESC04-00120 Site Final7/30/20087/30/20087/30/2008 2:43:49 PMPPASS
ESC03-00856 Site Final7/30/20087/30/20087/30/2008 2:43:30 PMPPASS
ESC06-01514 Site Final7/30/20087/30/20087/30/2008 2:15:38 PMPPASS
ESC03-01558 Site Final7/30/20087/30/20087/30/2008 2:15:25 PMPPASS
ESC03-01558 Site Final7/30/20087/30/20087/30/2008 2:15:11 PMPPASS
ESC07-01524 General Inspection7/30/20087/30/20087/30/2008 2:08:05 PMPPART
Verbal to RP: Wetlands achieved re-vegetation. Need to remove rock construction entrance and re-veg entry area and then permit is ready to final.
ESC04-01452 Site Final7/30/20087/30/20087/30/2008 1:59:41 PMPPASS
ESC04-01452 Site Final7/30/20087/30/20087/30/2008 1:59:24 PMPPASS
ESC07-00783 Site Final7/30/20087/30/20087/30/2008 1:59:10 PMPPASS
ESC06-00500 Site Final7/30/20087/30/20087/30/2008 1:58:52 PMPPASS
ESC08-00575 General Inspection7/30/20087/30/20087/30/2008 1:18:09 PMPPART
Overall site looks ok; appears vehicle traffic has bypassed rock construction entrance at times and driven on bare dirt; rock entrance could be increased in width to address this problem.