BLD08-01192
| BLD-Framing/Rough-in | 7/29/2008 | 7/30/2008 | 7/30/2008 5:29:25 PM | P | PASS |
|
|
john Phone #: ###-####
|
BLD08-01362
| BLD-Final | 7/29/2008 | 7/30/2008 | 7/30/2008 3:19:09 PM | P | NR |
|
|
tom Phone #: ###-####. LIfe/safety insp. failed.
|
BLD07-02839
| BLD-Framing/Rough-in | 7/29/2008 | 7/30/2008 | 7/30/2008 2:32:48 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 7/29/2008 at 2:36:01 PM. Contact: ###-####. Ranger station assembeled as per plan
|
BLD07-02836
| BLD-Framing/Rough-in | 7/29/2008 | 7/30/2008 | 7/30/2008 2:32:08 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 7/29/2008 at 2:33:45 PM. Contact: ###-####. reviewed special insp. reports on high strength bolting. steel framing ok.
|
BLD08-00620
| BLD-Energy code compliance | 7/30/2008 | 7/30/2008 | 7/30/2008 1:59:18 PM | P | PASS |
|
|
|
BLD08-00620
| BLD-Framing/Rough-in | 7/30/2008 | 7/30/2008 | 7/30/2008 1:59:04 PM | P | PASS |
|
|
Eric Phone #: ###-####
|
ESC08-00279
| General Inspection | 7/30/2008 | 7/30/2008 | 7/30/2008 1:58:24 PM | P | PASS |
|
|
sign posted, bmps ok.
|
BLD08-00984
| BLD-Framing/Rough-in | 7/29/2008 | 7/30/2008 | 7/30/2008 11:57:28 AM | A | CANC |
|
|
Mike- call before going Phone #: ###-####
|
BLD08-01010
| BLD-Framing/Rough-in | 7/29/2008 | 7/30/2008 | 7/30/2008 9:20:05 AM | A | CANC |
|
|
Logan Phone #: ###-####
|
BLD08-01010
| BLD-Foundation | 7/30/2008 | 7/30/2008 | 7/30/2008 8:58:29 AM | A | PASS |
|
|
Logan Phone #: ###-####
|
BLD08-01008
| BLD-Energy code compliance | 7/29/2008 | 7/30/2008 | 7/30/2008 8:57:45 AM | A | PASS |
|
|
Bray Phone #: ###-####
|
BLD08-01008
| BLD-Framing/Rough-in | 7/30/2008 | 7/30/2008 | 7/30/2008 8:57:32 AM | A | PASS |
|
|
Bray Phone #: ###-####. All issues resolved.
|