FIR09-00290
| INSP-Final Inspection | 7/29/2009 | 7/30/2009 | 7/31/2009 6:03:28 PM | P | PART |
|
|
Fire alarm system testing for the dry goods warehouse area begun today. MP stations, notification, EOL voltage, sprinkler riser supervision, and three duct detectors tested satisfactory. Correction items including added notification and a lowered pull station at the dry goods office also tested okay. Remaining items include the dry goods rack sprinkler system not finished for testing, one heat detector at the electrical room office area incorrectly located, need access to the printer/storage room to test notification appliance, NAC panels need accurate descriptors (battery trouble), the remainder of HVAC RTU's need powered in heat mode to enable functional testing of the detectors for unit shutdown. NETcon rating for the RF monitor is indicated as 0 per paperwork provided. Noted several trouble and supervisory conditions at the FACP due to construction underway for other portions of the building including one ground fault.
|
FIR09-00033
| INSP-Sprinkler Rough-in/Hydro | 7/24/2009 | 7/30/2009 | 7/30/2009 4:23:17 PM | A | FAIL |
|
|
24 hr. air testing concluded at 4:00 for the preaction systems at the freezer. Overhead systems #27 lost 13psi, #26 lost 4psi, #28 lost 3psi, #29 lost 9psi. NOTE: The rack systems #27, 26, 28, and 29 passed pneumatic test with no pressure loss at the guage.
|
FIR09-00425
| INSP-Final Inspection | 7/29/2009 | 7/30/2009 | 7/30/2009 4:17:51 PM | P | FAIL |
|
|
RF radio equipment for monitoring must have a NETcon rating of 5 or lower, see fire code review notes item #5 for details. Site testing indicated a NETcon 6.
|
FIR09-00428
| INSP-Final Inspection | 7/29/2009 | 7/30/2009 | 7/30/2009 4:17:32 PM | P | FAIL |
|
|
RF radio equipment for monitoring must have a NETcon rating of 5 or lower, see fire code review notes item #5 for details. Site testing indicated a NETcon 6.
|
FIR09-00427
| INSP-Final Inspection | 7/29/2009 | 7/30/2009 | 7/30/2009 4:17:16 PM | P | FAIL |
|
|
RF radio equipment for monitoring must have a NETcon rating of 5 or lower, see fire code review notes item #5 for details. Site testing indicated a NETcon 6.
|
FIR09-00426
| INSP-Final Inspection | 7/29/2009 | 7/30/2009 | 7/30/2009 4:16:58 PM | P | FAIL |
|
|
RF radio equipment for monitoring must have a NETcon rating of 5 or lower, see fire code review notes item #5 for details. Site testing indicated a NETcon 6.
|
FIR09-00261
| FIR-Aging Inspection | 7/30/2009 | 7/30/2009 | 7/30/2009 3:22:58 PM | | DONE |
|
|
Work in progress, site construction underway.
|
BLD08-01806
| FIRE-Final Inspection | 7/30/2009 | 7/30/2009 | 7/30/2009 3:22:01 PM | P | PASS |
|
|
Items on correction notice verified for compliance, life safety finaled.
|
BLD09-01169
| FIRE-Final Inspection | 7/30/2009 | 7/30/2009 | 7/30/2009 3:20:46 PM | P | PART |
|
|
Fire life safety inspection completed for the new legal office area, work to date is acceptable, door to the new office is not yet installed, discussed items needed for permit final at remodel locations.
|