ELE09-00151
| Permanent Service | 7/30/2009 | 7/30/2009 | 7/30/2009 5:53:49 PM | P | PASS |
|
|
mike Phone #: ###-#### . P/S U/G connect ok. Check on springkler bonding.
|
ELE08-00407
| Electrical Rough-In | 7/30/2009 | 7/30/2009 | 7/30/2009 5:47:17 PM | P | PART |
|
|
Joe Phone #: ###-####. ok to cover
|
ELE09-00900
| Electrical Rough-In | 7/30/2009 | 7/30/2009 | 7/30/2009 5:44:13 PM | P | PART |
|
|
u-fer ground inspection please-justin Phone #: ###-####.Ok to cover ufer with concrete.
|
ELE09-01375
| Electrical Rough-In | 7/30/2009 | 7/30/2009 | 7/30/2009 3:39:03 PM | P | PASS |
|
|
this is ready for cover inspection please call with any questions also reach Andy at ###-#### Phone #: ###-#### Internet Inspection Request from: Don Lustig. Ok to cover.
|
ELE09-01393
| Conference | 7/30/2009 | 7/30/2009 | 7/30/2009 2:53:36 PM | P | PART |
|
|
I just need a cover inspection for conduit between buildings in the ground. The Garage Addition is taking place behind the existing house. Please call me for specifics, or let me know when the builder can cover the ditch. Phone #: ###-#### Internet Inspection Request from: John McCurdy. Ok to cover underground 2inch conduit.
|
ELE09-01025
| Electrical Rough-In | 7/30/2009 | 7/30/2009 | 7/30/2009 1:43:49 PM | P | NH |
|
|
Scheduled by a contractor via Hello! on 7/30/2009 at 6:39:08 AM. Contact: ###-####. Not Home. Left message to reschedule.
|
ELE09-01388
| Electrical Rough-In | 7/29/2009 | 7/30/2009 | 7/30/2009 12:53:01 PM | P | PASS |
|
|
contact: Bob Schroder Phone #: ###-#### Internet Inspection Request from: Julie Schroder. Ok to cover living room.
|
ELE09-00455
| Final | 7/30/2009 | 7/30/2009 | 7/30/2009 12:33:48 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 7/30/2009 at 9:51:50 AM. Contact: ###-####. Ok final.
|
ELE09-00455
| DOC - Permit Finaled | 7/30/2009 | 7/30/2009 | 7/30/2009 12:33:30 PM | P | PASS |
|
|
|
ELE09-01381
| Permanent Service | 7/29/2009 | 7/30/2009 | 7/30/2009 10:31:59 AM | A | PASS |
|
|
warren Phone #: ###-####. P/S U/G reconnect ok.
|
ELE09-01381
| DOC - Permit Finaled | 7/30/2009 | 7/30/2009 | 7/30/2009 10:31:15 AM | P | PASS |
|
|
|
ESC08-01043
| General Inspection | 7/29/2009 | 7/30/2009 | 7/30/2009 10:12:13 AM | A | FAIL |
|
|
8-17-02.4E,J DI needs cleaned out. 8-17-02.4 P Concrete wash out liner needs installed. Hard surfaces need to be cleaned.
|
ELE09-01376
| Electrical Rough-In | 7/29/2009 | 7/30/2009 | 7/30/2009 10:08:27 AM | A | PART |
|
|
This is a spa, the inspection needed is, re-inspect on the bonding. thx! Phone #: ###-#### Internet Inspection Request from: Chris Weimar. Pool bonding ok to cover.
|
ESC09-00466
| General Inspection | 7/30/2009 | 7/30/2009 | 7/30/2009 10:07:46 AM | A | PASS |
|
|
SITE LOOKS GOOD.
|
ESC09-00462
| General Inspection | 7/30/2009 | 7/30/2009 | 7/30/2009 9:49:49 AM | A | PASS |
|
|
Job site very clean.
|
ELE09-01382
| Electrical Rough-In | 7/29/2009 | 7/30/2009 | 7/30/2009 9:47:55 AM | A | PART |
|
|
Rough-in on reinforcing steel in slab. Early A.M. if possible please. Concrete contractor wanting to pour at 10:00 A.M. Please call 1/2 hr. prior to inspection. Thank you, Dan Phone #: ###-#### Internet Inspection Request from: Dan Wright. Pool bonding ok to cover.
|