BLD13-01948
| FIRE-Final Inspection | 7/29/2014 | 7/30/2014 | 7/30/2014 5:56:31 PM | P | PASS |
|
|
Fire life safety passed field inspection.
|
FIR14-00294
| INSP-Final Inspection | 7/30/2014 | 7/30/2014 | 7/30/2014 5:51:47 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
BLD13-03418
| FIRE-Final Inspection | 7/29/2014 | 7/30/2014 | 7/30/2014 2:38:23 PM | A | PART |
|
|
Phase one work at the basement level west side CH2 elevator lobby sheet A100 okayed. Phase one 1st floor west side CH2 sheet A110 hall, lobby, and office okay with the exception of overspaced fire sprinkler coverage at office 103 due to relocated walls.
|
BLD14-00700
| FIRE-Final Inspection | 7/29/2014 | 7/30/2014 | 7/30/2014 10:53:11 AM | A | PART |
|
|
Items needed prior to final include; install remainder of drop ceiling at the IT closet per keynote #5, provide approved hardware at the new conference room door, post tenant space address numbers.
|