Inspections for the day of: Thursday, July 30, 2015.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE10-00565 ELE-Aging Inspection7/30/20157/30/20157/31/2015 1:01:04 PM CANC
to busy
ELE15-02318 Permanent Service7/30/20157/30/20157/30/2015 3:21:58 PMPPASS
Contact: Ron Lawrence Phone #: ###-#### Inspection requested via web by Deb Gooden service change ok verify conduit fill and junction box make up discussed changing dryer and range to four wire but house is older then 1996 not required p/s o/h rec ok
ELE15-02299 Final7/29/20157/30/20157/30/2015 3:00:05 PMPPASS
Please call for access code Phone #: ###-#### Inspection requested via web by Rick Beckman final ok
ELE15-02318 Final7/30/20157/30/20157/30/2015 2:43:59 PMPCANC
Contact: Ron Lawrence Phone #: ###-#### Inspection requested via web by Deb Gooden needed p/s
ELE15-01718 Final7/30/20157/30/20157/30/2015 1:30:20 PMPPASS
Contact Steve Hess for installation details or Seth VanWassenhove for final breaker change out @ ###-#### Phone #: ###-#### Inspection requested via web by Cathy Duchek final ok
ELE15-01718 Permanent Service7/30/20157/30/20157/30/2015 1:28:40 PMPPASS
Contact Steve Hess for installation details or Seth VanWassenhove for final breaker change out @ ###-#### Phone #: ###-#### Inspection requested via web by Cathy Duchek p/s u/g n ok
ELE15-01944 Final7/30/20157/30/20157/30/2015 12:50:58 PMPPASS
Wade Fitzgerald will meet you on site to walk you through the system. He will call to schedule a time. Phone #: ###-#### Inspection requested via web by Matthew Dunay photovoltiac final ok
GCE15-00109 GCE-Final7/30/20157/30/20157/30/2015 12:11:43 PMPPASS
Stephanie ###-#### post light final ok
GCE15-00106 GCE-Final7/30/20157/30/20157/30/2015 12:10:49 PMPPASS
Stephanie ###-#### post light final
ELE15-02357 Conference7/30/20157/30/20157/30/2015 11:13:06 AMPDONE
Like to have you check out the wellhead that will be in the concrete floor of the shop. Please call when on site to discuss ###-#### Danny Phone #: ###-#### Inspection requested via web by danny perrine conference on running u/f through chase for well controller
ELE15-01925 Final7/29/20157/30/20157/30/2015 10:49:48 AMAPASS
Final inspection for this project. Please call Blake at ###-#### 30 minutes prior to arrival as no one will be at the job location. Thank you so much and have a super day! Phone #: ###-#### Inspection requested via web by Laura Longshaw basement bathroom final ok
ELE15-01413 Final7/29/20157/30/20157/30/2015 10:09:43 AMAPASS
We are requesting a final inspection for tomorrow 7/30/15 in the AM. Our onsite contact is Bud @ ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Clint Tate final ok
ELE15-01720 Final7/29/20157/30/20157/30/2015 9:20:35 AMAPASS
Justin Phone #: ###-#### signs final ok
ELE15-02130 Final7/29/20157/30/20157/30/2015 8:59:38 AMAPASS
Phone #: ###-#### Inspection requested via web by Shawna Gates final ok
ELE15-02355 Electrical Rough-In7/30/20157/30/20157/30/2015 7:20:46 AMACANC
Phone #: ###-#### >> Inspection requested via web by John VanZandt Inspection cancelled from web by: John VanZandt
ELE15-02345 Conference7/29/20157/30/20157/30/2015 12:00:00 AMACANC
Dayton Phone #: ###-####-please call 1 hour prior to meet